Laserfiche WebLink
<br />Resolution No. PC-97-85 <br />Page 7 <br /> <br />13. The developers shall remove the existing 6" sanitary sewer on Ray Street across the <br />project frontage and replace it with an 8" diameter sewer main conforming to SDR 26. <br /> <br />14. The developers shall install a permanent driveway apron on Ray Street for the trail/EV A <br />within the Alameda County Transportation Corridor and shall construct vertical curb, <br />gutter, and sidewalk between that driveway and the project's private street entrance onto <br />Ray Street.t <br />{end} <br />