Laserfiche WebLink
DocuSign Envelope ID: E9C36B8D-E90E-4CE7-9DA5-BF39B42482B9 <br />Bidder acknowledges receipt of the following addendum: <br />No. <br />1 <br />2 <br />Date No. Date <br />03/04/2024 <br />03/14/2024 <br />Bidder to perform all of the work described in the Contract Documents for the total bid <br />amount entered. <br />Item <br />Quantity <br />Unit of <br />No. <br />(Approximate) <br />Measure <br />Item Description <br />Unit Price <br />Total <br />CnNCTR I J TTON <br />1 <br />1 <br />LS <br />STAKING <br />$ 19,000.00 <br />$ 19,000.00 <br />2 <br />LEAD COMPLIANCE <br />1I <br />T C <br />PT AN <br />$ 2.500.00 <br />$ 2 500 00 <br />3 <br />CONSTRUCTION AREA <br />1 <br />LS <br />SIGNS <br />$ 3,900.00 <br />$ 3,900.00 <br />4 <br />TR A FFTr rOTNTTP M <br />1 <br />LS <br />SYSTEM <br />$ 344,600.12 <br />$ 344,600.12 <br />5 <br />1 <br />EA <br />TYPE III BARRICADE <br />$ 140.00 <br />$140.00 <br />TDraDnD ADV <br />6 <br />PAVEMENT MARKING <br />140 <br />S FT <br />(PAINT) <br />$ 4.00 <br />$ 560.00 <br />rrV A 4DnD A DV 'TD A DDTO <br />1 Ll.11 .'A. "l 1 1' <br />7 <br />12500 <br />LF <br />STRIPE (PAINT) <br />$ 2.00 <br />$ 25,000.00 <br />8 <br />CHANNELIZER <br />50 <br />VA <br />!CT TD V A Or A 4nT TAT'PDTV% <br />\U\,.- LV�L 1.1V V.I ALLj <br />ct en nn <br />W <br />Q 3 nnn nn <br />W �,.+�.+•+v <br />9 <br />TEMPORARY <br />230 <br />EA <br />PAVEMENT MARKER <br />$ 6.00 <br />$ 1,380.00 <br />10 <br />rrnr 4nnn A n V n A TT TAT/'`_ <br />I L-AV11 IJl�L 11� 1 1�l1LLuvv <br />600 <br />LF <br />(TYPE K) <br />$ 65.69 <br />$ 39,414.00 <br />TEMPORARY <br />1 T <br />11 <br />A T ?`Un AT A TTT M nn A ru <br />ALCU1L1�1VA 11 Y L' VL\A�711 <br />1 <br />EA <br />SHION <br />$ 4,500.00 <br />$ 4,500.00 <br />12 <br />1 <br />LS <br />JOB SITE MANAGEMENT <br />$ 45,862.35 <br />$ 45,862.35 <br />PREPARE WATER <br />13 <br />POLLUTION CONTROL <br />1 <br />LS <br />PROGRAM <br />$ 1,300.00 <br />$ 1,300.00 <br />14 <br />RAIN EVENT ACTION <br />23 <br />EA <br />PLAN <br />$ 65.00 <br />$ 1,495.00 <br />15 <br />S T GRivi w�iTER <br />SAMPLING AND <br />7 <br />EA <br />ANALYSIS DAY <br />$ 65.00 <br />$ 455.00 <br />Addendum #2, CIP No. 15525 Page 7 <br />