My WebLink
|
Help
|
About
|
Sign Out
PC-97-65
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1997
>
PC-97-65
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:08 AM
Creation date
12/29/2004 11:06:26 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
8/13/1997
DOCUMENT NO
PC-97-65
DOCUMENT NAME
PUD-81-30-71D
NOTES
SECURITY CAPITAL PACIFIC TRUST/PRUDENTIAL INSURANCE
NOTES 3
540-UNIT APARTMENT COMPLEX
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-97-65 <br />Page 18 <br /> <br />h.) Construction access routes shall be limited to those approved by the City Engineer or <br />Building Inspector and shall be shown on the approved grading plan. <br /> <br />88. The applicants shall work with City staff to design a portion of the on-site storm drain <br />system to drain over the lawn area of the 3.0 acre park site. Said design shall be subject <br />to the review and approval of the City Engineer, Parks and Community Services Director, <br />and Planning Director prior to issuance of an on-site permit for the project. For those <br />areas of the site that do not drain to the park site, the applicant shall install structural <br />control(s), such as an oil/water separator, sand filter, or approved equal (e.g., Dura Drain <br />Fossil Filterâ„¢) in the parking lot to intercept and pretreat storm water prior to reaching <br />the storm drain. The design, locations, and a schedule for maintaining the separator shall <br />be submitted to the City Engineer/Director of Building Inspection for review and <br />approval prior to issuance of building permits. The structural control shall be cleaned at <br />least twice a year: once immediately prior to October I and once in January. The <br />applicant shall enter into a maintenance agreement for the oil/water separator with the <br />City. <br /> <br />89. The car wash areas shall be covered and shall drain through an oiVwater separator to the <br />sanitary sewer, subject to approval by DSRSD, or collected in a holding tank for removal <br />by a disposal and recycling service. If the area is connected to the sanitary sewer, a sign <br />shall be posted prohibiting the dumping of hazardous materials. Recycling of water is <br />encouraged. No other area shall drain to the car wash area; a berm shall be installed to <br />prevent such drainage if found necessary by the City Engineer/ Director of Building <br />Inspection. <br /> <br />90. The applicant shall sweep or vacuum the parking lot and sidewalks a minimum of once a <br />month and shall prevent the accumulation of litter and debris on the site. Corners and <br />hard to reach areas shall be swept manually. If sidewalks and!or the parking lot are <br />pressure washed, debris must be trapped and collected to prevent entry into the storm <br />drain system. No cleaning agent may be discharged into the storm drain. If any cleaning <br />agent or degreaser is used, wash water must be collected and discharged to the sanitary <br />sewer, subject to approval of the Dublin-San Ramon Services District (DSRSD). <br /> <br />91. All trash enclosure areas shall be completely covered. An area drain shall be installed in <br />the enclosure area which connects to the sanitary sewer. A structural control such as an <br />oil/water separator or sand filter shall be provided. No other area shall drain into the <br />trash enclosure; a berm shall be installed to prevent such drainage iffound necessary by <br />the City Engineer/Director of Building Inspection. A sign shall be posted prohibiting the <br />dumping of hazardous materials into the sanitary sewer. The applicant shall notifY the <br />Dublin-San Ramon Services District (DSRSD) upon installation of the sanitary <br />connection; a copy of this notification shall be provided to the Planning Department. <br /> <br />{end} <br />
The URL can be used to link to this page
Your browser does not support the video tag.