My WebLink
|
Help
|
About
|
Sign Out
PC-97-61
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
1990-1999
>
1997
>
PC-97-61
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2006 9:33:08 AM
Creation date
12/29/2004 10:55:36 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/23/1997
DOCUMENT NO
PC-97-61
DOCUMENT NAME
PUD-80-2-16D
NOTES
PARKWAY PROPERTIES
NOTES 3
2-4-STORY BLDG
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Resolution No. PC-97-61 <br />Page 13 <br /> <br />Urban Clean Water Run-Off <br /> <br />64. The applicant shall install a structural control, such as an oil/water separator, sand filter, or <br />approved equal in the parking lot (s) to intercept and pretreat storm water prior to <br />reaching the storm drain. The design, locations, and a schedule for maintaining the <br />separator shall be submitted to the City Engineer/Director of Building Inspection for <br />review and approval prior to issuance of building permits. The structural control shall be <br />cleaned at least twice a year: once immediately prior to October 15 and once in January. <br />The applicant shall enter into a maintenance agreement for the oil/water separator. <br /> <br />65. The trash enclosure area(s) shall be completely covered. An area drain shall be installed in <br />the enclosure area which connects to the sanitary sewer. A structural control such as an <br />oil/water separator or sand filter shall be provided. No other area shall drain into the trash <br />enclosure; a berm shall be installed to prevent such drainage if found necessary by the City <br />EngineerIDirector of Building Inspection. A sign shall be posted prohibiting the dumping <br />of hazardous materials into the sanitary sewer. The applicant shall notifY the Dublin-San <br />Ramon Services District (DSRSD) upon installation of the sanitary connection; a copy of <br />this notification shall be provided to the Planning Department. <br /> <br />66. The applicant shall sweep or vacuum the parking lot and sidewalks a minimum of once a <br />month and shall prevent the accumulation oflitter and debris on the site. Corners and <br />hard to reach areas shall be swept manually. If sidewalks and/or the parking lot are <br />pressure washed, debris must be trapped and collected to prevent entry into the storm <br />drain system. No cleaning agent may be discharged into the storm drain. If any cleaning <br />agent or degreaser is used, wash water must be collected and discharged to the sanitary <br />sewer, subject to approval of the Dublin-San Ramon Services District (DSRSD). <br /> <br />67. The applicant shall label all on-site storm drain inlets with the wording, "No Dumping-- <br />Drains to Bay" using City-approved methods and materials. On-site storm drain facilities <br />shall be cleaned a minimum of twice a year as follows: immediately prior to October 15 <br />and once in January. Additional cleaning may be required iffound necessary by the City <br />Engineer/Director of Building Inspection. <br /> <br />68. Prior to the commencement of any clearing, grading, or excavation, the applicant shall <br />submit a copy of the State Water Resources Control Board Notice ofIntent (NOI) for <br />coverage under the State Construction Storm Water General Permit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.