Laserfiche WebLink
<br />Resolution No. PC-97-58 <br />Page 4 <br /> <br />EXHmIT B <br />Silver Bear, Ltd. <br />Conditions of Approval <br />Case PUD-97-10 <br /> <br />1. Development shall be substantially as shown on the development plans, Exhibit "A", dated <br />"Received May 29, 1997" and "Received June 10, 1997" on file with the Planning <br />Department, except as modified by the following conditions. Minor changes to the plans <br />may be allowed subject to the approval of the Planning Director iffound to be in <br />substantial conformance to the approved exhibits. <br /> <br />2. The uses and site development standards of this site shall follow those of the Agricultural <br />District (A) of the Pleasanton Municipal Code. All structures and improvements shall be <br />subject to the provisions of Section 18.20 Design Review of the Pleasanton Municipal <br />Code. <br /> <br />3. The final design of the turnaround and gate shall be subject to the review and approval by <br />the Fire Chief prior to the issuance of a building permit for the barn. <br /> <br />4. Prior to the issuance of any grading or on-site permit, the applicant shall indicate how the <br />barn will be serviced with sewer and water. The applicant may continue to <br />utilize any existing wells or septic systems if approved by the County of Alameda <br />Health Services Department. <br /> <br />5. The developer shall submit a final grading and drainage plan prepared by a licensed civil <br />engineer depicting all final grades and on-site drainage control measures, including <br />concrete-lined V-ditches, to protect all cut and fill slopes from surface water overflow. <br />This plan shall be subject to the review and approval of the City Engineer and/or the <br />Director of Building Inspection prior to the issuance of any building permits. <br /> <br />6. The developer shall submit an erosion and sedimentation control plan or procedure as part <br />of the improvement plans. Grading completed prior to October 15 shall be revegetated <br />and stabilized by October 15. Grading completed between October 16 and April 15 shall <br />be revegetated and restabilized as soon as possible after completion of grading. <br /> <br />7. The developer shall submit a refundable cash bond for hazard and erosion control prior to <br />issuance of an Engineering or Building Department permit. The amount of this bond will <br />be determined by the City Engineer. <br /> <br />8. The developer shall submit a dust control plan or procedure as part of the improvement <br />plans. <br /> <br />9. The developer's contractor(s) shall obtain an encroachment permit from the City Engineer <br />prior to moving any construction equipment onto the site. <br /> <br />.-.--..----.--....-----------.--.......----- <br />