<br />81.) All paved outdoor storage areas shall be designed to minimize pollutant runoff. Bulk <br />materials stored outdoors that may contribute to the pollution of storm water runoff must <br />be covered as deemed appropriate by the City Engineer/ Director of Building Inspection. <br /> <br />82.) The applicant shall label all on-site storm drain inlets with the wording, "No Dumping-- <br />Drains to Bay" using City-approved methods and materials. On-site storm drain facilities <br />shall be cleaned a minimum of twice a year as follows: immediately prior to October 15 <br />and once in January. Additional cleaning may be required if found necessary by the City <br />Engineer/Director of Building Inspection. <br /> <br />83.) The applicant shall include erosion control/storm water quality measures on the final <br />grading plan which shall specifically address measures to prevent soil, dirt, and debris from <br />entering the storm drain system. Such measures may include, but are not limited to, <br />hydro seeding, hay bales, sandbags, and siltation fences and are subject to the review and <br />approval of the City Engineer/Director of Building Inspection. Ifno grading plan is <br />required, necessary erosion control/storm water quality measures shall be shown on the <br />site plan submitted for an on-site permit, subject to the review and approval of the <br />Director of Building Inspection. The applicant is responsible for ensuring that the <br />contractor is aware of and implements such measures. <br /> <br />84.) All metal roofs shall be finished with rust-inhibitive paint. <br /> <br />85.) The applicant shall submit a construction Best Management Practices (BMP's) program <br />for review and approval by the Planning Director prior to issuance of building and/or <br />grading permits. These BMP's shall be implemented by the general contractor and all <br />subcontractors and suppliers of materials and equipment. Construction site cleanup and <br />control of construction debris shall also be addressed. Failure to comply with the <br />approved construction BMP may result in the issuance of correction notices, citations, or <br />a stop work order. <br /> <br />86.) The applicant is responsible for implementing the following measures during all <br />construction phases of the project: <br /> <br />a. Gather all construction debris on a regular basis and place it in a dumpster or other <br />container which is emptied or removed an a weekly basis. When appropriate, use <br />tarps on the ground to collect fallen debris or splatters that could contribute to <br />storm water runoff pollution. <br />