Laserfiche WebLink
<br /> <br />P23-0480 and TR8680 Planning Commission April 23, 2025 <br />Page 16 of 31 <br />City’s adopted Master Fee Schedule. Review of the subdivision map cannot commence <br />until the applicant has submitted payment to the City for these costs. If the ultimate fee at <br />the conclusion of the work is less than this payment, the applicant will be refunded the <br />difference. If the ultimate fee is more than this payment, then the applicant shall submit <br />payment for the difference before the consultant certifies the map. <br /> <br />The following statement shall be included on the cover sheet of the map: “I, [NAME <br />PROVIDED BY CITY], P.L.S, Acting City Surveyor for the City of Pleasanton, Alameda <br />County, California, do hereby state that I have examined this map entitled “[MAP <br />NAME/NUMBER]”, and I am satisfied that said map is technically correct. [SIGNATURE <br />LINE], [DATE], [SPACE FOR STAMP]”. (Address this condition prior to final map <br />approval) <br /> <br />73. DEDICATIONS TO THE CITY: Dedications to the City shall conform to the following <br />standards, whether dedicated on a subdivision map or by recorded separate instrument: <br />a. For final maps, right-of-way dedications for roadways or similar access shall be <br />offered irrevocably to the City as an easement for public purposes pursuant to <br />California Government Code Section 66439(d)(3), including the right to install and <br />operate public utilities. Right-of-way is defined in Pleasanton Municipal Code <br />§13.04.010. <br />b. Public Service Easements (PSE) shall be granted to the City in accordance with the <br />Pleasanton Municipal Code §19.24.190 and 19.36.110. PSEs shall be offered as an <br />easement for public purposes including but not limited to installation, construction, <br />access, and maintenance of all public services facilities above and below the ground <br />surface including poles, wires, conduits, vaults, cabine ts, sanitary sewers, storm <br />drains, gas lines, and water lines as well as all those public utilities and <br />appurtenances thereto as subject to regulation under Pleasanton Municipal Code <br />Chapter 13.04. Consistent with California Government Code Section 66439(d )(3), the <br />offer shall include the statement, “The real property described below is dedicated as <br />an easement for public purposes…” <br />c. Dedications for public access over sidewalk or driveway areas shall exclude the City’s <br />obligation for maintenance pursuant to California Streets and Highways Code §5610. <br />d. Dedications in fee title shall only be granted upon approval by the City Engineer. <br />Consistent with California Government Code Section 66439(d)(2), the offer shall <br />include the statement, “The real property described below is dedicated in fee for <br />public purposes…” (Address this condition prior to final map approval) <br /> <br />74. DATUM FOR VERTICAL CONTROL: Vertical control surveying for all improvements to <br />be constructed shall be based on the North American Vertical Datum of 1988 (NAVD 88). <br />Any benchmarks used that relied on the National Geodetic Vertical Datum of 1929 <br />(NGVD 29) shall be converted to NAVD 88 when presented on plans. The location of the <br />benchmark and source of data shall also be disclosed on the plans. (Address this <br />condition prior to improvement plan approval) <br /> <br />75. SURVEY MONUMENTS FOR HORIZONTAL CONTROL: Final maps shall include <br />sufficient durable survey monuments to allow the subdivision to be retraced in <br />conformance with Pleasanton Municipal Code §19.24.220. Setting of monuments shall be <br />in accordance with the California Government Code §66495-66498. The surveyor shall <br />Docusign Envelope ID: 2B93F64A-C49E-4C2A-BF54-785F6FDA6546