My WebLink
|
Help
|
About
|
Sign Out
SR 05:003
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2005
>
SR 05:003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2004 11:44:47 AM
Creation date
12/22/2004 11:43:16 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
STAFF REPORTS
DOCUMENT DATE
1/4/2005
DESTRUCT DATE
15 Y
DOCUMENT NO
SR 05:003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
referred to as CIP No. 025071A and the electrical conversions are referred to as CIP No. <br />025071B. The Street Lighting Project was awarded on October 5, 2004. <br /> <br />CURRENT EXPENDITURES <br /> <br />First Street Lighting Construction Contract (025071A) <br />First Street Lighting Contingency 15% <br />Construction Services (Survey/Soils) <br />Design Consultant (Street lighting and Service Lateral conversions) <br /> Subtotal <br /> <br />FUTURE EXPENDITURES <br /> <br />Individual Electrical Property Conversions (025071B) (estimated) <br />Installation of 5 remaining light fixtures (estimated) <br /> Subtotal <br /> <br />Total Projected Expenditures <br /> <br />PROJECTED FUTURE FUNDING <br /> <br />First and Kottinger Undergrounding Phase I & II <br />Street Lights and Electrical Service Laterals (CIP NO. 025071) <br /> Current Project Balance <br />Reimbursement Rule 20A Funds (SAY 80% of $200,000) <br />Appropriation of additional funding (10/5/04) Street Lighting Project <br />Commercial Property Reimbursement (estimated) <br /> Total Projected Funding <br /> <br />$480,342 <br />$72,051 <br />$10,000 <br />$138,210 <br />$7O0,603 <br /> <br />$200,000 <br /> $25,000 <br />$225,000 <br /> <br />$925,603 <br /> <br />$560,490 <br />$160,000 <br />$114,113 <br />$35,000 <br />$869,603 <br /> <br />Based on the above estimates, the total project deficit, once reimbursements from PG&E and <br />commercial properties are received, is estimated to be $56,000. However, in addition to the <br />projected funding short-fall of $56,000, it is anticipated that approximately $200,000 will need <br />to be added to the project until such time that the City is reimbursed from either Rule 20A funds <br />or from private commercial reimbursements. Until such time as bids are received, the projected <br />revenue short-fall is an estimate. Staff will be able to better assess the funding needs for the <br />project at the time of project award. <br /> <br />SR:05:003 <br />Page 3 of 4 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.