My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL WORKSHOP AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2025
>
030425
>
WORKSHOP
>
CITY COUNCIL WORKSHOP AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/18/2025 2:35:05 PM
Creation date
3/4/2025 12:44:41 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
3/4/2025
DESTRUCT DATE
20Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 10 <br />Item #2 <br /> CITY COUNCIL AGENDA REPORT <br /> <br />March 4, 2025 <br />Public Works - Utilities Division <br /> <br />TITLE: ACCEPT THE WATER ENTERPRISE FINANCIAL ANALYSIS AND APPROVE <br />THE ENHANCE SCENARIO <br /> <br />SUMMARY <br />In 2023, the City conducted a water rate study, which resulted in Council approval of a 30 <br />percent water rate increase in January 2024 and a 12 percent increase in 2025. During the <br />study, staff identified the need for a comprehensive Water System Management Plan (WSMP) <br />to guide future water rate studies. Following this, on January 21, 2025, the City Council <br />adopted the WSMP, a long-term planning document that provides a detailed assessment of <br />the City’s water system assets, capital improvement needs, and operations and maintenance <br />requirements over the next 20 years. The WSMP serves as the foundational document for this <br />rate study. <br /> <br />To support this effort, on September 3, 2024, the City awarded a contract to Water Resources <br />Economics, LLC (WRE) to conduct water and sewer rate and connection fee studies. WRE <br />has now completed a financial plan analysis which is the first step in a three-step process. This <br />step is focused on the revenue increase that is needed to support WSMP CIP implementation; <br />it is not adoption of water rate increases as that is the final step which will be considered by the <br />City Council in June. This report presents the analysis results based on which three primary <br />scenarios were developed: Stabilize, Enhance, and Accelerate. Staff, and the Pleasanton <br />Water Advisory Group, recommend the City Council accept the financial analysis findings and <br />approve the Enhanced scenario as the preferred approach for the 2026-2029 water rate study. <br /> <br />RECOMMENDATION <br />Accept the Water Enterprise Financial Analysis and approve the Enhance scenario. <br /> <br />BACKGROUND <br />A financial plan within a water rate study is an essential tool for ensuring the long-term <br />sustainability, reliability, and affordability of a municipality’s water system. It evaluates the <br />financial health of the water utility and determines necessary revenue adjustments—typically <br />through rate changes—to cover operational, maintenance, and capital improvement costs. <br /> <br />Key Objectives of the Financial Plan: <br />• Revenue Sufficiency – Ensures the utility generates adequate revenue to cover daily <br />operations, debt service, and capital investments while maintaining financial stability <br />• Capital Planning & Infrastructure Investment – Identifies funding strategies for <br />necessary system upgrades, replacements, and expansions to maintain service <br />reliability and regulatory compliance <br />• Cost-of-Service Analysis – Allocates costs among customer classes (residential, <br />commercial, industrial) to ensure fair and equitable rate structures <br />Page 3 of 27
The URL can be used to link to this page
Your browser does not support the video tag.