Laserfiche WebLink
Ordinance No. 2290 <br />Page 12 of 34 <br />Director of Engineering/City Engineer and Director of Community Development prior to <br />building permit issuance. <br />26. MECHANICAL EQUIPMENT — SCREENING: The applicant shall effectively screen <br />from view all ducts, meters, air conditioning equipment, and any other mechanical <br />equipment, whether on the structure, on the ground, or on the roof, with materials <br />architecturally compatible with the building. Screening details shall be shown on the <br />plans submitted for building permit, the adequacy of which shall be determined by the <br />Director of Community Development. All required screening shall be installed prior to <br />final occupancy. <br />27. TRASH ENCLOSURE: All trash, refuse, and recycling shall be contained completely <br />within enclosures. Containers shall be stored within the enclosures at all times except <br />when being unloaded. The enclosures shall be sized to accommodate trash, <br />recycling, and green waste containers in compliance with the Alameda County <br />Mandatory Recycling Ordinance. The materials and colors of any new enclosures <br />shall match or be compatible with the primary building on site and the gates shall be <br />metal or solid wood unless otherwise approved by the Director of Community <br />Development. Elevation drawings and plan details, including color and material of the <br />enclosures noted, shall be included in the building permit submittal and shall be <br />subject to the review and approval of the Director of Community Development prior to <br />building permit issuance. <br />28. RECYCLING AND COMPOSTING PROGRAMS: The project shall comply with the <br />current City/Pleasanton Garbage Service recycling and composting programs. <br />Green Building and Sustainability Measures <br />29. Climate Action Plan 2.0 Compliance: Prior to building permit issuance, a GHG <br />Emission Compliance Checklist shall be provided, to the Planning Division for review <br />and approval by the Director of Community Development. The measures shall be <br />shown on the building permit plans submitted to the Building and Safety Division. The <br />Checklist shall include notation indicating the sheet(s) the measure can be found. <br />Prior to building permit final, all of the measures indicated on the approved checklist <br />shall be inspected and approved by the City of Pleasanton. <br />30. ALL -ELECTRIC: This project is to have no new gas infrastructure installed. This shall <br />be noted on the plans submitted for Building Permits. <br />Construction Practices and Noticing <br />31. WORK HOURS: All demolition and construction activities, inspections, plan checking, <br />material delivery, staff assignment or coordination, etc., shall be limited to the hours of <br />8 a.m. to 5 p.m., Monday through Friday. No construction shall be allowed on State or <br />Federal Holidays or Saturdays or Sundays. The Director of Community Development <br />may allow earlier "start times" or later "stop times" for specific construction activities. <br />All construction equipment shall meet Department <br />