Laserfiche WebLink
<br /> <br /> <br /> <br />P21-1173, PUD-146, and Tract 8631 PC-2024-17, October 23, 2024 <br /> <br />13 of 34 <br /> <br />Development. Details of the new electrical transformers, and any screening <br />architecturally compatible with the building, shall be included in the building permit <br />submittal and shall be subject to the review and approval of the Director of <br />Engineering/City Engineer and Director of Community Development prior to building <br />permit issuance. <br /> <br />26. MECHANICAL EQUIPMENT – SCREENING: The applicant shall effectively screen <br />from view all ducts, meters, air conditioning equipment, and any other mechanical <br />equipment, whether on the structure, on the ground, or on the roof, with materials <br />architecturally compatible with the building. Screening details shall be shown on the <br />plans submitted for building permit, the adequacy of which shall be determined by the <br />Director of Community Development. All required screening shall be installed prior to <br />final occupancy. <br /> <br />27. TRASH ENCLOSURE: All trash, refuse, and recycling shall be contained completely <br />within enclosures. Containers shall be stored within the enclosures at all times except <br />when being unloaded. The enclosures shall be sized to accommodate trash, recycling, <br />and green waste containers in compliance with the Alameda County Mandatory <br />Recycling Ordinance. The materials and colors of any new enclosures shall match or be <br />compatible with the primary building on site and the gates shall be metal or solid wood <br />unless otherwise approved by the Director of Community Development. Elevation <br />drawings and plan details, including color and material of the enclosures noted, shall be <br />included in the building permit submittal and shall be subject to the review and approval <br />of the Director of Community Development prior to building permit issuance. <br /> <br />28. RECYCLING AND COMPOSTING PROGRAMS: The project shall comply with the <br />current City/Pleasanton Garbage Service recycling and composting programs. <br /> <br />Green Building and Sustainability Measures <br /> <br />29. Climate Action Plan 2.0 Compliance: Prior to building permit issuance, a GHG Emission <br />Compliance Checklist shall be provided, to the Planning Division for review and <br />approval by the Director of Community Development. The measures shall be shown on <br />the building permit plans submitted to the Building and Safety Division. The Checklist <br />shall include notation indicating the sheet(s) the measure can be found. Prior to building <br />permit final, all of the measures indicated on the approved checklist shall be inspected <br />and approved by the City of Pleasanton. <br /> <br />30. ALL-ELECTRIC: This project is to have no new gas infrastructure installed. This shall be <br />noted on the plans submitted for Building Permits. <br /> <br />Construction Practices and Noticing <br /> <br />31. WORK HOURS: All demolition and construction activities, inspections, plan checking, <br />material delivery, staff assignment or coordination, etc., shall be limited to the hours of <br />Docusign Envelope ID: 1C31F480-26DA-46E0-9342-FE27B8023A42