Laserfiche WebLink
Docusign Enve lope ID : 06FEEA0D-4CA2-41 B7-B308-52AA86026DE1 <br />Site Development and Building Design <br />10. BUILDING MATERIALS AND COLORS: The building materials and colors in the <br />Approved Plans shall be stated on the building permit plans . <br />11 . EXTERIOR CHANGES : Except as specified in the Approved Plans, changes to the <br />exterior of the building shall not be made without prior approval from the Planning <br />Division. (Project Specific Condition) <br />12 . SIGNAGE: Except as specified in the Approved Plans, this approval does not include <br />approval of any other signage for Philz Coffee. If additional signs are desired, Philz <br />Coffee shall submit a sign proposal to the Planning Division for review and approval <br />prior to sign installation . (Project Specific Condition) <br />13 . BUILDING PERMIT: Any tenant improvement plans shall be submitted to the Building <br />and Safety Division for review and approval prior to operation . The applicant shall obtain <br />a building permit prior to commencement of any work. <br />14. FINAL INSPECTION: Final inspection by the Planning Division is required prior to <br />occupancy. <br />15. FEES: The applicant shall pay any and all fees to which the property may be subject, <br />prior to issuance of grading and/or building permits , or pr ior to recordation of the final <br />map, whichever is applicable. The type and amount of the fees shall be those in effect <br />at the time the permit is issued . <br />TRAFFIC ENGINEERING DIVISION -925-931-5677 <br />16. PARKING MONITORING . Monitoring of circulation and parking during operational hours <br />may be conducted by Traffic Engineering staff. If parking exceeds the allowed allotment <br />and/or circulation problems arise once the fitness facility is in operation , as determined <br />by the City 's Traffic Eng ineer, this Conditional Use Permit may be submitted to the <br />Planning Commission for their subsequent review at a public hearing . If necessary, the <br />Planning Commission may modify or add conditions of approval to mitigate such <br />impacts or may revoke said Conditional Use Permit. (Project Specific Condition) <br />ENVIRONMENTAL SERVICES DIVISION -925-931-5515 <br />17. BACKFLOW TESTING. Prior to occupancy, the applicant shall contact the <br />Environmental Services Division to ensure the project site is in full backflow testing <br />compliance . (Project Specific Condition) <br /><End> <br />P24-0670, -0671 , -0672 PC -2024-19, December 11 , 2024 <br />Page 3 of 3 <br />Docusign Envelope ID: 06FEEA0D-4CA2-41B7-B308-52AA86026DE1