My WebLink
|
Help
|
About
|
Sign Out
POINTE STRATEGIES
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
P
>
POINTE STRATEGIES
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2025 10:15:23 AM
Creation date
1/14/2025 1:08:48 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Landscape Maintenance
Contract Type
New
NAME
POINTE STRATEGIES
Contract Record Series
704-05
Munis Contract #
2025389
Contract Expiration
6/30/2025
NOTES
CALLIPPE TRAIL RENOVATION
Document Relationships
POINTE STRATEGIES (2)
(Attachment)
Path:
\CITY CLERK\CONTRACTS\P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />ENGINEERING DEPARTMENT P. O. BOX 520, Pleasanton, CA 94566-0802 <br />Engineering Construction Services Landscape Architecture <br />200 Old Bernal Ave. 157 Main Street 200 Old Bernal Ave. <br />(925) 931-5650 (925) 931-5680 (925) 931-5650 <br />Fax: 931-5479 Fax: 931-5484 Fax: 931-5479 <br /> <br /> <br /> <br /> <br /> <br />Date: August 1, 2024 <br /> <br />To: Gerry Beaudin, City Manager <br /> <br />Through: Siew-Chin Yeong, Director of Public Works <br /> <br />From: Matt Gruber, Landscape Architect <br /> <br />Subject: Approval of informal bid for the renovation of the Callippe Trail <br /> <br /> <br />The Callippe trail has eroded into a state of disrepair, requires maintenance, and was identified <br />as the top trail priority for the developer contributions provided for trail renovations from the <br />Meadowlark development project as directed by the City Council on May 17, 2022. <br /> <br />Subsequently CIP Project No. 24767 was approved by Council for FY 23/24 implementation. <br />Work consists of the repair of approximately 3 miles of existing natural earth trail, including <br />repair of eroded trail sections, improving the trail for mountain bike use, minor grading to <br />improve drainage, installing armored crossings for drainage across the trail, providing vegetation <br />clearance, and filling ground squirrel holes on the trail. <br /> <br />In June 2024, the Public Works Department solicited informal bids in accordance with the March <br />21, 2023, City Purchasing Procedures and Manual for the renovation of the Callippe Trail. The <br />informal bid process for public work contracts was followed. City staff contacted four contractors <br />with past trail renovation experience or references from other agencies: <br /> <br /> <br />1. Santa Cruz Mountains Trail Stewardship <br />2. Trailscape <br />3. Pointe Strategies <br />4. American Ramp Company <br /> <br />In July 2024, the City received two bid proposals and a confirmation from Santa Cruz Mountains <br />Trail Stewardship declining to provide a bid proposal. Staff then contacted American Ramp <br />Company to inquire whether they would be willing to submit a bid and they also declined to bid <br />the project. The bid results received are as follow: <br /> <br />Landscape Contractor Bid Amount <br />1. Pointe Strategies $48.992.06 <br />2. Trailscape $51,943.00 <br /> <br />Pointe Strategies was the qualified low bidder. <br /> <br />Docusign Envelope ID: DC6BDBD2-15FB-4A32-AD1D-259624389679Docusign Envelope ID: 2462BFEF-7321-437F-941F-04E5906B4A10
The URL can be used to link to this page
Your browser does not support the video tag.