Laserfiche WebLink
N <br />N <br />1. CONTRACTORS SHALL VERIFY ALL DIMENSIONS WITH <br />CONDITIONS AT THE JOB SITE BEFORE PROCEEDING WITH <br />ANY WORK. CONTRACTORS SHALL NOTIFY PROJECT <br />DESIGNER IF EXISTING CONDITIONS DIFFER FROM THOSE <br />ON DRAWINGS. <br />2. ALL DIMENSIONS SHALL BE AS INDICATED ON <br />DRAWINGS OR AS CLARIFIED BY PROJECT DESIGNER. <br />UNDER NO CIRCUMSTANCES SHALL DIMENSIONS BE <br />DETERMINED BY SCALING THE DRAWINGS. <br />3. ANY ERRORS, OMISSIONS, OR CONFLICTS FOUND IN <br />THE VARIOUS PARTS OF THE CONSTRUCTION <br />DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF <br />THE PROJECT DESIGNER PRIOR TO COMMENCEMENT OF <br />WORK. <br />4. ALL WORK SHALL COMPLY WITH ALL APPLICABLE <br />CODES, ORDINANCES, AND THE HIGHEST STANDARDS OF <br />THE TRADE. <br />5. ALL WORK SHALL BE DONE IN A SAFE, ORDERLY <br />MANNER WITHOUT DAMAGE TO OTHER PARTS OF THE <br />PREMISES OR ADJACENT PROPERTIES. <br />6. NO MATERIALS CONTAINING ASBESTOS MAY BE USED. <br />SHEET INDEX <br />SCOPE OF WORK CONTACT LIST <br />CITY OF PLEASANTON MUNICIPAL CODE <br />2022 CBC, CALIFORNIA BUILDING CODE <br />2022 CRC, CALIFORNIA RESIDENTIAL CODE <br />2022 CMC, CALIFORNIA MECHANICAL CODE <br />2022 CEC, CALIFORNIA ELECTRICAL CODE <br />2022 CPC, CALIFORNIA PLUMBING CODE <br />2022 CFC, CALIFORNIA FIRE CODE <br />2022 CCR, CALIFORNIA CODE OF REGULATIONS, TITLE 24 <br />2022 CALIFORNIA GREEN BUILDING STANDARD CODE <br />2022 CALIFORNIA ENERGY CODE <br />PARCEL MAP <br />VICINITY MAPCODE COMPLIANCE <br />GENERAL NOTES GREEN CODEABBREVIATIONS <br />1. INTERIOR REMODEL OF EDUCATION/BUSINESS UNIT TO <br />ADD DAYCARE USE FOR 18 MONTHS TO FIVE YEARS OLD <br />CHILDREN. <br />2. CONVERT EXISTING OFFICES TO NEW DAYCARE ROOMS. <br />3. PROVIDE TOTAL 6 DAYCARE ROOM TO SUPPORT NINETY <br />THREE STUDENTS (FIVE YOUNGER THAN 36 MONTHS <br />INFANTS AND TODDLERS AND EIGHTY-EIGHT 36 MONTHS OR <br />OLDER CHILDREN). <br />4. CHANGE INDOOR PLAY AREA TO INCLUDE READING AREA <br />AND BOOK STACK AREA. <br />5. CONVERT 9 PARKING SLOTS TO 1364 SF OUTDOOR PLAY <br />GROUND, MODIFY LANDSCAPE AND SIDEWALK AS NEEDED <br />TO ACHIEVE THE DESIGN. <br />ACADEMIC CENTER OF <br />VOLITATION, CORP. <br />PRESCHOOL <br />6663 OWENS DR, <br />PLEASANTON, CA 94588 <br />SITE <br />SITE <br />PROPERTY INFORMATION <br />ZONING:PUD-1/C-O <br />APN:941-1301-064-00 <br />OCCUPANCY:B AND E <br />OCCUPANCY LOAD:222, TOTAL 93 STUDENTS <br />AGE OF STUDENTS: 18 MONTHS TO 5 YEARS <br />HOURS OF OPERATION: 8 AM - 6 PM, MONDAY TO FRIDAY <br />AVERAGE TEACHER TO STUDENTS: 8:1 <br />TYPE OF CONSTRUCTION:TYPE V-B <br />FIRE SPRINKLERS:YES (EXISTING) <br />EXISTING PARKING:173 (OFF STREET, V.I.F) <br />PROPOSED PARKING:164 (OFF STREET, V.I.F) <br />LOT AREA:156,380 SF <br />EXISTING PROPOSED TOTAL <br />BUILDING FLOOR AREA:11,135 SF NO CHANGE 11,135 SF <br />BUILDING FOOTPRINT:11,135 SF NO CHANGE 11,135 SF <br />@ AT <br />ACOUS.ACCOUSTICAL <br />A.D.AREA DRAIN <br />ADJ.ADJUSTABLE OR <br />ADJACENT <br />A.G.ABOVE GRADE <br />A.F.F.ABOVE FINISHED <br />FLOOR <br />AL.ALUMINUM <br />ARCH.ARCHITECTURAL <br />ASPH.ASPHALT <br />BD.BOARD <br />BLDG.BUILDING <br />BM.BEAM <br />CH.CEILING HEIGHT <br />CAB.CABINET <br />CEM.CEMENT <br />CER.CERAMIC <br />CLR.CLEAR <br />COL.COLUMN <br />CONSTR.CONSTRUCTION <br />CONT.CONTINUOUS <br />CONC.CONCRETE <br />D.DEEP <br />DIA.DIAMETER <br />DS.DOWNSPOUT <br />DWG.DRAWING <br />ELEV.ELEVATION <br />(E)EXISTING <br />E.EAST <br />EA.EACH <br />ELEC.ELECTRICAL <br />EQ.EQUAL <br />EXT.EXTERIOR <br />EXP.EXPANSION <br />F.E.C.FIRE EXTINGUISHER <br />CABINET <br />FIN.FINISH <br />FLR.FLOOR <br />FLUOR.FLUORESCENT <br />F.O.F.FACE OF FINISH <br />F.O.S.FACE OF STUD <br />FT.FOOT OR FEET <br />GALV.GALVANIZED <br />GA.GAUGE <br />GL.GLASS <br />GYP.GYPSUM <br />HT.HEIGHT <br />HEX.HEXAGON <br />H.HIGH <br />H.C.HOLLOW CORE <br />H.M.HOLLOW METAL <br />HR.HOUR <br />INSUL.INSULATION <br />INT.INTERIOR <br />L.LONG <br />LT.LIGHT <br />MIN.MINIMUM <br />MTD.MOUNTED <br />(N)NEW <br />N.NORTH <br />N.I.C.NOT IN CONTRACT <br />NO.OR # NUMBER OR POUND <br />N.T.S.NOT TO SCALE <br />O.A.OVERALL <br />O.C.ON CENTER <br />O.H.OPPOSITE HAND <br />P.D.P.POWDER DRIVEN PIN <br />PL.PLATE <br />P.LAM.PLASTIC LAMINATE <br />PLYWD.PLYWOOD <br />(R)REMOVE(D) <br />R.RADIUS <br />REQ.REQUIRE(D) <br />RM.ROOM <br />R.O.ROUGH OPENING <br />S.C.SOLID CORE <br />SCHED.SCHEDULED <br />SIM.SIMILAR <br />SHT.SHEET <br />SPEC.SPECIFICATION <br />STD.STANDARD <br />STOR.STORAGE <br />SUSP.SUSPENDED <br />S/S STAINLESS STEEL <br />SQ.SQUARE <br />TEL.TELEPHONE <br />T.&G.TONGUE & GROOVE <br />THK.THICK <br />TYP.TYPICAL <br />U.O.N.UNLESS OTHERWISE NOTED <br />VERT.VERTICAL <br />V.I.F.VERIFY IN FIELD <br />V.C.T.VINYL COMPOSITION TILE <br />W.C.WATER CLOSET <br />WD.WOOD <br />W/WITH <br />W/O WITHOUT <br />WP.WATERPROOF <br />W.R.WATER RESISTANT <br />WT.WEIGHT <br />PROJECT ADDRESS: <br />6663 OWENS DR. <br />PLEASANTON, CA 94588 <br />OWNER: <br />RAY ZHAO <br />CELL: (925) 353-888 <br />EMAIL: [email protected] <br />DESIGNER: <br />ORANGE ENGINEERING LLC <br />4005 CLIPPER CT <br />FREMONT, CA 94538 <br />(408)888-7836 <br />[email protected] <br />[email protected] <br />MEP ENGINEER: <br />CDI, INC. <br />16520 BAKE PARKWAY, SUITE 100 <br />IRVINE, CA 92618 <br />(949)336-6636 <br />A 0.0 COVER SHEET <br />A 1.0 EXISTING SITE PLAN <br />A 1.1 PROPOSED SITE PLAN <br />A 1.2 PROPOSED PLAYGROUND PLAN <br />A 2.0 EXISTING FLOOR PLAN <br />A 2.1 PROPOSED FLOOR PLAN <br />A 3.0 PATH OF EGRESS <br />A 4.0 EXISTING CEILING PLAN <br />A 4.1 PROPOSED CEILING PLAN <br />A 5.0 PROPOSED FENCE ELEVATIONS <br />A 7.0 ADA DETAILS <br />C1.0 CLEAN BAY BLUE PRINT <br />STRUCTURAL <br />SN1.0 GENERAL NOTE <br />S1.0 FOUNDATION PLAN <br />S2.0 ROOF FRAMING PLAN <br />SD1.0 DETAIL <br />MECHANICAL <br />M000 MECHANICAL NOTES <br />M001 MECHANICAL SCHEDULES & DETAILS <br />M100 MECHANICAL PLAN <br />M1.1 MECHANICAL PLAN - ROOF PLAN <br />TM00 MECHANICAL TITLE 24-1 <br />ELECTRICAL <br />E000 ELECTRICAL SPECIFICATION <br />E001 SINGLE LINE DIAGRAM/SCHEDULES <br />E100 LIGHTING PLAN <br />E200 POWER PLAN <br />G1. ANNULAR SPACES AROUND PIPES, ELECTRIC <br />CABLES, CONDUITS OR OTHER OPENINGS IN SOLE/ <br />BOTTOM PLATES AT EXTERIOR WALLS SHALL BE <br />CLOSED WITH CEMENT MORTAR, CONCRETE <br />MASONRY OR A SIMILAR METHOD ACCEPTABLE TO THE <br />ENFORCING AGENCY TO PREVENT PASSAGE OF <br />RODENTS PER CGBSC 4.406.1. <br />G2. MIN. 65% OF THE CONSTRUCTION WASTE <br />GENERATED SHALL BE RECYCLED AND/OR SALVAGED <br />PER CGBSC 4.408.1. <br />G3. AN OPERATION AND MAINTENANCE MANUAL SHALL <br />BE PROVIDED TO THE BUILDING OCCUPANT OR <br />OWNER PER CGBSC 4.410.1. <br />G4. AT THE TIME OF ROUGH INSTALLATION, DURING <br />STORAGE ON THE CONSTRUCTION SITE AND UNTIL <br />FINAL STARTUP OF THE HEATING, COOLING AND <br />VENTILATING EQUIPMENT, ALL DUCT AND OTHER <br />RELATED AIR INTAKE AND DISTRIBUTION COMPONENT <br />OPENINGS SHALL BE COVERED. TAPE, PLASTIC, SHEET <br />METALS, OR OTHER METHODS ACCEPTABLE TO THE <br />ENFORCING AGENCY TO REDUCE THE AMOUNT OF <br />WATER, DUST AND DEBRIS ENTERING THE SYSTEM <br />MAY BE USED PER CGBSC 4.504.1. <br />G5. FINISH MATERIALS SHALL COMPLY WITH SECTION <br />4.504.2.1 THROUGH 4.504.5.1. <br />G6. ADHESIVES, SEALANT AND CAULKS SHALL BE <br />COMPLIANT WITH VOC OR OTHER TOXIC COMPOUND <br />LIMIT PER CGBSC 4.504.2.1. <br />G7. PAINT AND COATING SHALL BE COMPLIANT WITH <br />VOC LIMIT PER CGBSC 4.504.2.2. <br />G8. AEROSOL PAINTS AND COATINGS SHALL BE <br />COMPLIANT WITH PRODUCT WEIGHTED MIR LIMITS <br />FOR ROC OR OTHER TOXIC COMPOUND PER CGBSC <br />4.504.2.3. <br />G9. DOCUMENTATION SHALL BE PROVIDED TO THE <br />CITY BUILDING INSPECTOR UPON REQUEST, <br />VERIFYING THAT COMPLIANT VOC LIMIT MATERIALS <br />HAVE BEEN USED PER CGBSC 4.504.2.4. <br />G10. ALL CARPET AND CARPET SYSTEMS SHALL BE <br />COMPLIANT WITH VOC LIMIT PER CGBSC 4.504.3. <br />G11. 80% OF FLOOR AREA RECEIVING RESILIENT <br />FLOORING SHALL COMPLY WITH VOC EMISSION LIMITS <br />DEFINED IN THE COLLABORATIVE FOR HIGH <br />PERFORMANCE PRODUCT (CHPS) LOW-EMITTING <br />MATERIAL LIST OR BE CERTIFIED UNDER THE <br />RESILIENT FLOOR COVERING INSTITUTE (RCFI) <br />FLOOR SCORE PROGRAM PER CGBSC 4.504.3.4. <br />G12. HARDWOOD PLYWOOD, PARTICLEBOARD AND <br />MEDIUM DENSITY FIBERBOARD COMPOSITE WOOD <br />PRODUCTS USED ON THE INTERIOR OR EXTERIOR OF <br />THE BUILDING SHALL BE COMPLIANT WITH LOW <br />FORMALDEHYDE EMISSIONS STANDARDS PER CGBSC <br />4.504.5. <br />G13. A CAPILLARY BREAK SHALL BE INSTALLED IF A <br />SLAB ON GRADE FOUNDATION SYSTEM IS USED. THE <br />USE OF A 4” THICK BASE OF ½” OR LARGER CLEAN <br />AGGREGATE UNDER A 6-MIL VAPOR RETARDER WITH <br />JOINT LAPPED NOT LESS THAN 6” WILL BE PROVIDED <br />PER CGBSC 4.505.2 AND CRC R506.2.3. <br />G14. BUILDING MATERIALS WITH VISIBLE SIGNS OF <br />WATER DAMAGE SHALL NOT BE INSTALLED. WALL AND <br />FLOOR FRAMING SHALL NOT BE ENCLOSED WHEN THE <br />FRAMING MEMBERS EXCEED 19% MOISTURE <br />CONTENT. MOISTURE CONTENT SHALL BE VERIFIED IN <br />COMPLIANCE WITH THE CGBSC 4.505.3. <br />G15. INSTALL ENERGY STAR BATHROOM FANS ON <br />TIMER OR HUMIDISTAT AND BE DUCTED TO TERMINATE <br />OUTSIDE THE BUILDING, SHALL BE PROVIDED IN <br />EVERY NEW/REMODELED BATHROOM PER CGBSC <br />4.506.1. <br />G16. HEATING AND AIR-CONDITIONING SYSTEMS <br />SHALL BE SIZED, DESIGNED AND HAVE THEIR <br />EQUIPMENT SELECTED USING THE FOLLOWING <br />METHODS (CGBSC 4.507.2): <br />1.THE HEAT LOSS AND HEAT GAIN IS ESTABLISHED <br />ACCORDING TO ANSI/ACCA 2 MANUAL J-2011 OR <br />EQUAL; <br />2.DUCT SYSTEMS ARE SIZED ACCORDING TO ANSI/ <br />ACCA 1 MANUAL D-2014 OR EQUAL. <br />3.SELECT HEATING AND COOLING EQUIPMENT <br />ACCORDING TO ANSI/ACCA3 MANUAL S-2014 OR <br />EQUAL <br />4.EXCEPTION: USE OF ALTERNATE DESIGN <br />TEMPERATURES NECESSARY TO ENSURE THE <br />SYSTEMS FUNCTION ARE ACCEPTABLE. <br />G17. HVAC SYSTEM INSTALLERS SHALL BE TRAINED <br />AND CERTIFIED IN THE PROPER INSTALLATION OF <br />HVAC SYSTEMS AND EQUIPMENTS BY A RECOGNIZED <br />TRAINING OR CERTIFICATION PROGRAM PER CGBSC <br />702.1. <br />G18. DOCUMENTATION OF COMPLIANCE SHALL <br />INCLUDE, BUT IS NOT LIMITED TO, CONSTRUCTION <br />DOCUMENTS, PLANS, SPECIFICATIONS, BUILDER OR <br />INSTALLER CERTIFICATION, INSPECTION REPORTS, OR <br />OTHER METHODS ACCEPTABLE TO THE LOCAL <br />ENFORCING AGENCY. OTHER SPECIFIC <br />DOCUMENTATION OR SPECIAL INSPECTIONS <br />NECESSARY TO VERIFY COMPLIANCE ARE SPECIFIED <br />IN APPROPRIATE SECTIONS OF CALGREEN PER <br />CGBSC 4.703. <br />A 0.0 <br />ORANGE <br />ENGINEERING <br />4005 CLIPPER CT <br />FREMONT, CA 94538 <br />TEL (408) 888-7836 <br />OE2303 <br />11/22/23 <br />9 <br />8 <br />7 <br />6 <br />5 <br />4 <br />3 <br />2 <br />DATE: <br />JOB NO. <br />ISSUE & REVISION <br />SHEET NO. <br />DRAWN BY: <br />1 <br />CITY SUBMITTALMM/DD/YY <br />6663 OWENS DR, <br />PLEASANTON, CA 94588 <br />ACADEMIC CENTER OF VOLITATION, <br />CORP. - PRESCHOOL <br />SHEET NAME. <br />SY-CHENG TSAI C-24234 <br />1/31/25 <br />DATE <br />RENEWAL <br />SY-CHENG TSAI <br />T <br />AR <br />C <br />H <br />E <br />I <br />T <br />C <br />LI <br />DESECN <br />N IA <br />AC FIL O R <br />S <br />OF <br />T <br />T <br />A <br />E <br />C-24234 <br />COVER SHEET <br />ARCHITECTURAL <br />11 <br />11 <br />DEFERRED SUBMITTAL <br />FIRE ALARM SHALL BE DEFERRED SUBMITTAL <br />FIRE SPRINKLER SHALL BE DEFERRED SUBMITTAL <br />11 <br />09/03/2024 PLANNING REV1 <br />11