My WebLink
|
Help
|
About
|
Sign Out
USL PLEASANTON LAKES, L.P.
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
U
>
USL PLEASANTON LAKES, L.P.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2024 3:49:13 PM
Creation date
12/12/2024 2:53:55 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Other
Contract Type
New
NAME
USL PLEASANTON LAKES, L.P.
Contract Record Series
704-05
Contract Expiration
2/27/2025
NOTES
REINBURSEMENT AGREEMENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Pleasanton <br />East Pleasanton Annexation Hydraulic Analysis <br />PROPOSAL <br />SCOPE OF WORK <br />Task No.Task Title Task Description <br />Se <br />n <br />i <br />o <br />r <br /> <br />P <br />r <br />i <br />n <br />c <br />i <br />p <br />a <br />l <br />Pr <br />i <br />n <br />c <br />i <br />p <br />a <br />l <br />As <br />s <br />o <br />c <br />i <br />a <br />t <br />e <br /> <br />E <br />n <br />g <br />i <br />n <br />e <br />e <br />r <br />As <br />s <br />i <br />s <br />t <br />a <br />n <br />t <br /> <br />E <br />n <br />g <br />i <br />n <br />e <br />e <br />r <br />En <br />g <br />i <br />n <br />e <br />e <br />r <br />i <br />n <br />g <br /> <br />As <br />s <br />i <br />s <br />t <br />a <br />n <br />t <br />GI <br />S <br /> <br />A <br />n <br />a <br />l <br />y <br />s <br />t <br />To <br />t <br />a <br />l <br /> <br />H <br />o <br />u <br />r <br />s <br />Labor Costs Total Cost <br />$289 $261 $193 $165 $131 $142 <br />Task 1 <br />Hydraulic Analysis <br />for the East <br />Pleasanton <br />Annexation <br />This task includes the following: <br />1. Estimate the water demands for each development (Site H, <br />Arroyo Lago, and the Senior Housing) based on the new <br />development densities provided by City staff. <br />2. Incorporate proposed pipeline between the south end of El <br />Charro Road near Stoneridge Drive and the east end of Busch <br />Road into the hydraulic model <br />3. Perform hydraulic analysis to determine the pro-rata share <br />cost of the proposed water main. <br />Deliverables: Brief technical memorandum documenting the <br />results of the hydraulic analysis. <br />2 8 12 8 6 4 40 $7,656 $7,656 <br />Total 2 8 12 8 6 4 40 $7,656 $7,656 <br />11/22/2024 <br />Hours Costs <br />FEE ESTIMATE <br />Docusign Envelope ID: DE4F6CA6-4C33-49EA-9C39-5A4F73667203Docusign Envelope ID: F6C477C7-534E-43F3-861E-BB8269240249
The URL can be used to link to this page
Your browser does not support the video tag.