My WebLink
|
Help
|
About
|
Sign Out
PRESIDIO SYSTEMS, INC. (2)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
P
>
PRESIDIO SYSTEMS, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2024 3:36:30 PM
Creation date
10/29/2024 2:47:36 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
As-Needed Agreement for Maintenance or Trade
Contract Type
Amendment
NAME
PRESIDIO SYSTEMS, INC.
Contract Record Series
704-05
Munis Contract #
2022383
Contract Expiration
6/30/2025
NOTES
SEWER AND STORM FLUSHING & CCTV SERVICES PROJ. NO. OSD 2021-603
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 2 <br />Includes copyrighted material of Insurance Services Office, Inc., with permission. <br /> <br />PIC-GLN-028 (08/14) <br />THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. <br />DESIGNATEDCONSTRUCTIONPROJECT(S) GENERAL AGGREGATE <br />LIMIT <br />WITH MAXIMUM POLICYAGGREGATE LIMIT <br />This endorsement modifies insurance provided under the following: <br />COMMERCIAL GENERAL LIABILITY COVERAGE PART <br />SCHEDULE <br />Designated Construction Project(s): <br />All projects performed by the Named Insured. <br />Designated Construction Project General Aggregate Limit of Insurance:$2,000,000 <br />Maximum Policy Aggregate Limit of Insurance:$5,000,000 <br />(If no entry appears above, information required to complete this endorsement will be shown in the <br />Declarations as applicable to this endorsement.) <br />A.For all sums which the insured becomes legally obligated to pay as damages caused by “occurrences” <br />under SECTIONI –COVERAGE A, and for all medical expenses caused by accidents under <br />SECTION I –COVERAGE C, which can be attributed only to ongoing operations at a single <br />Designated Construction Project shown in the SCHEDULE above: <br />1.A separate Designated Construction Project General Aggregate Limit applies to each designated <br />construction project, and that limit is equal to the amount shown in the SCHEDULE above. <br />However, regardless of the number of construction projects and under no circumstances will we <br />pay any more than the Maximum Policy Aggregatestated in the endorsement SCHEDULE <br />above. <br />2.The Designated Construction Project General Aggregate Limit is themost we will pay for the sum <br />of all damages under Coverage A, except damages because of “bodily injury” or “property <br />damage” included in the “products-completedoperations hazard” regardless of the number of: <br />a.Insureds; <br />b.Claims made or “suits” brought; or <br />c.Persons or organizations making claims or bringing “suits.” <br />3.Any payments made under Coverage A for damages or under Coverage C for medical expense <br />shall reduce the Designated Construction Project General Aggregate Limit for that designated <br />construction project. Such payments shall not reduce the General Aggregate Limit shown in the <br />Declarations nor shall they reduce any other Designated Construction Project General Aggregate <br />Limit for any other designated construction project shown in the SCHEDULE above. <br />Docusign Envelope ID: D32E8023-554D-4B88-88F3-521E56BCE792
The URL can be used to link to this page
Your browser does not support the video tag.