Laserfiche WebLink
8 <br /> <br /> <br />SPECIFIC SCOPE OF WORK: <br /> Framing: <br />x Construction of new internal walls using metal studs, including door openings (see attached drawings) <br /> <br />Electrical: <br />x Installation of new receptacles (see attached drawings), with new circuits to the existing panel <br />x Rewiring of storage lights to new switches, with a 3-way switch configuration for the Supervisor’s <br />office <br />x Addition of new occupancy sensors for lighting in the open office areas <br /> <br />Insulation: <br />x Insulate all new walls with R13 or R19 insulation <br /> <br />Drywall: <br />x Install 5/8 drywall on all new walls/constructions <br />x Compliance with fire safety regulations ensuring 18” clearance from fire sprinklers <br />x Sealing and fire caulking of the fire-rated demising wall <br />x Tape, skim all joints, and provide a smooth finish <br /> <br />Primer and Paint: <br />x Prime and paint all new drywall, new doors, and trims to level 4 finish <br />x Additional tasks include painting over existing vinyl wallpaper and stained wood sills <br /> <br />Disposal: <br />x Proper disposal of construction-related debris <br /> <br /> <br />Exclusions: <br />x Lighting Fixtures <br />x Phone/Data Wiring & Trim Plates <br />x Carpet & Base Installations <br />x Replacement of Stained Ceiling Panels <br />x HVAC Related Items <br />x Exterior Work <br />Docusign Envelope ID: 5BAAB023-F505-4D97-B8B7-10D2069DCBD0