My WebLink
|
Help
|
About
|
Sign Out
WILSON GENERAL CONTRACTING, INC. #2024610
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
W
>
WILSON GENERAL CONTRACTING, INC. #2024610
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2024 3:51:33 PM
Creation date
10/2/2024 12:33:18 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
Other
Contract Type
New
NAME
WILSON GENERAL CPNTRACTING, INC. #2024610
Contract Record Series
704-05
Munis Contract #
2024610
Contract Expiration
12/31/2024
NOTES
OSC - SEWER/PUBLIC RECORDS REMODEL PROJECT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Wilson General Contracting Inc. <br />1852 W 11 St., Suite 149 <br />Tracy, CA 95376 <br />+1 9259151606 <br />w_generalcontractor@yahoo.com <br />http://www.wilsongeneralcontracting.com <br />Proposal <br />ADDRESS <br />City of Pleasanton <br />Sewer Department <br />3333 Bush Rd. <br />Pleasanton CA <br />DATE <br />05/22/2024 <br />TOTAL <br />$71,834.00 <br />ACTIVITY QTY RATE AMOUNT <br />Demo <br />Demo existing cabinet and remove carpet in <br />office area, demo bathroom walls, dispose all <br />debris. <br />1 5,200.00 5,200.00 <br />Framing <br />Frame new bathroom wall and door opening, <br />frame new walls and door opening <br />separating office area and storage . All new <br />walls in the office area will not exceed 7’6'' to <br />the top due to sprinkler coverages not being <br />block by the walls. <br />1 12,950.00 12,950.00 <br />Electrical <br />Install new receptacles in the new bathroom <br />layout. relocate switch for bathroom, install <br />new receptacles in new walls, storage area <br />and open office area. install all new finish. <br />1 8,650.00 8,650.00 <br />Drywall <br />Install new 5/8 drywall on all new walls, tape <br />top all drywall joints, skim float walls to match <br />with the existing drywall texture. <br />1 15,514.00 15,514.00 <br />Primer and Paint <br />Primer and paint new drywall and existing <br />walls in storage, office area, bathroom, lobby <br />area, entry, office room, paint doors and <br />trims, doors Qty 3 one color only with <br />Sherwin Williams paint. <br />1 15,875.00 15,875.00 <br />Doors and Trims <br />Install new pre hung door in storage room, <br />reinstall existing bathroom door on new <br />bathroom walls. <br />1 5,000.00 5,000.00 <br />Docusign Envelope ID: 5BAAB023-F505-4D97-B8B7-10D2069DCBD0
The URL can be used to link to this page
Your browser does not support the video tag.