My WebLink
|
Help
|
About
|
Sign Out
Parks and Recreation Commission Agenda Packet 091224
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PARKS AND RECREATION
>
2024
>
09122024
>
Parks and Recreation Commission Agenda Packet 091224
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2024 10:02:40 AM
Creation date
9/27/2024 10:01:08 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/12/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF PLEASANTON <br />MASTER FEE SCHEDULE <br />E. Grading Fees <br />Grading Plan Review Fee 75% of Grading Fee <br />Grading Fee <br />Less than 50 cubic yards Exempt <br />50 to 10,000 cubic yards <br /> First 1,000 cubic yards $270 <br /> Each additional 1,000 cubic yards or fraction thereof $20 <br />10,001 to 100,000 cubic yards <br /> First 10,000 cubic yards $450 <br /> Each additional 1,000 cubic yards or fraction thereof $14 <br />100,001 cubic yards or more See III Engineering Section D <br />F. Other Fees <br />ADMINISTRATIVE CHARGE FOR MISCELLANEOUS REQUESTS: <br />Inspections outside normal business hours 2-hr minimum <br />Reinspection 2-hr minimum <br />2-hr minimum <br />Housing Inspections, requested by home owner 1-hr minimum <br />Temp Occupancy Inspection (up to 30 days max)4-hr minimum <br />$165 <br />$150 <br />ALTERNATE MEANS & METHODS REQUEST FEE <br />Plan review requests for alternate means and methods. <br />INVESTIGATION FEE <br />TECHNOLOGY FEE <br />5% of total permit fees <br />GIS MAPPING FEE <br />New developed sites, per square foot $0.002 <br />Time & Material, <br />1-hr minimum* <br />Applicable to any work commenced on a building, structure, electrical, gas, <br />mechanical or plumbing system before obtaining the necessary permits and <br />approvals, in addition to the required permit fees.100% of Building Permit Fee <br />For permitting software licensing, IVR licensing, archiving and additional <br />technology costs associated with providing permitting and inspection services. <br />All City of Pleasanton Building Division Fees shall be revised annually on January 1 by the percentage <br />increase or decrease in the Engineering News Record Construction Cost Index (CCI) for the San Francisco Bay <br />Area, and reviewed every two years. <br />MISCELLANEOUS BUILDING <br />INSPECTIONS** <br />Administrative costs associated with items not otherwise specified, reports and <br />requests not covered by permit or plan review fees. <br />Time & Material Basis, <br />$20 Minimum <br />Inspections for which no fee is specifically <br />indicated. <br />Nonrefundable fee to administer and implement the WMP review and <br />verification on covered projects not otherwise subject to California Green <br />Building Standards. <br />WASTE MANAGEMENT PLAN FEE PMC §9.21.010 <br />**All Hourly Inspection Rates are based on fully burdened Building Inspector rate or <br />consultant cost, whichever is greater. <br />IV. Building: 13 of 52 <br />Page 42 of 95
The URL can be used to link to this page
Your browser does not support the video tag.