My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGUALR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
090324 REGULAR
>
CITY COUNCIL REGUALR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 11:54:46 AM
Creation date
9/11/2024 11:54:23 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/3/2024
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Financial Analysis <br />The financial analysis will analyze the financial status of the water, recycled water and sewer <br />systems by projecting the expenses of each utility system and determining if overall rate adjustments <br />are needed to meet the full revenue requirements. The revenue requirements should sufficiently fund <br />the utility’s O&M, debt service, capital expenses, and reserves. The City anticipates conducting the <br />financial analysis with a 5-year projected time frame and on a cash basis approach. Over the next <br />few years, the City will be updating the master plan documents for each utility system as well as <br />implementing asset management. In 2023, the City went through the water rate process and the <br />Council adopted the following rate revenue adjustment: 30% effective January 1, 2024, and 12% <br />effective January 1, 2025. The Council also approved annual CPI increases for sewer effective <br />January 1, 2024, and July 1, 2024. This rate study will include a preliminary 10-year CIP. <br /> <br />Cost of Services <br />The objective of the cost of services analysis is to ensure that revenue requirements are equitably <br />distributed to ratepayers commensurate with their service requirements. The outcomes of the <br />analysis are to have the revenue requirements determined as part of the financial analysis allocated <br />among the customer classes and to derive average unit costs to be used during the rate design. The <br />analysis shall utilize generally accepted methodologies such as that outlined in the American Water <br />Works Association (AWWA) Manual M1. The consultant will review and evaluate the current <br />connection fee program and policies compared to standard industry practice and relevant law. <br /> <br />Rate Design <br />The rate design shall work within legal framework and industry standards to recover expenses and <br />best support the various City goals discussed in phase 1. During this phase, proposed rate structures <br />will be developed for each utility system that include alternative analyses with pros, cons, and rate <br />impacts quantified for the City’s review. The analysis will also compare proposed rates for each <br />utility with that of neighboring and comparable cities. The rate design will be finalized based on <br />comments and direction provided by the City. <br /> <br />In addition to the rate design, other miscellaneous water and sewer related fees and charges imposed <br />by the City (as shown in City’s Master Fee Schedule) will be reviewed and evaluated with <br />recommendations for updating. <br /> <br />The financial model used by the consultant shall be the property of the City upon completion of the <br />project. The model shall be user-friendly, in a program currently utilized by City staff (such as <br />Microsoft Excel), have the ability to easily analyze the impact due to changes in assumptions or rate <br />structures, and include a written training type manual in Microsoft Word. <br /> <br />Phase 3: Rate and Connection Fee Adoption and Additional Services <br />A final component of this engagement will be assisting City staff with the rate and connection fee <br />adoption process. This includes documenting the rate and connection fee studies results to serve as <br />the City’s administrative record and a public education tool about the proposed changes, rational and <br />justification behind the changes, and their anticipated financial impacts. Other tasks related to <br />customer education and outreach will be defined after selection of the consultant and further <br />development of the scope. <br />Page 38 of 46
The URL can be used to link to this page
Your browser does not support the video tag.