My WebLink
|
Help
|
About
|
Sign Out
CITY COUNCIL REGULAR MEETING AGENDA PACKET
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
091724 REGULAR
>
CITY COUNCIL REGULAR MEETING AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2024 11:34:35 AM
Creation date
9/11/2024 11:33:28 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
9/17/2024
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 8 of 14 <br />years. <br /> <br />Measures Taken to Address the Infrastructure Funding Gap <br />As noted, $18.9 million in capital project funding, including funding for the Skate Park <br />expansion and Century House renovation projects, was diverted to fund necessary life and <br />safety projects, primarily critical storm drain projects. With the deferral/defunding of other <br />capital projects to fund these critical storm drain projects – which rely on the General Fund – <br />the City is falling further behind on developing and replacing its aging infrastructure. Overall, <br />the City’s infrastructure will continue to age and deteriorate without a significant infusion of <br />new revenue resources, especially with capital costs continuing to grow. <br /> <br />Enterprise Funds (Water and Sewer) <br />The City’s major enterprise funds include the Water and Sewer Funds, financed primarily <br />through user charges and separate from the General Fund. Enterprise funds are designed to <br />be supported as business-like entities, whereby customers are charged a fee for the service. <br />Enterprise funds are not designed to generate a profit or excess revenue, but they do need to <br />cover their costs and have adequate reserves to address emergency situations. <br /> <br />Water and Sewer Program Funding Needs <br />Both the Water Fund and the Sewer Fund need additional resources to support operations <br />and infrastructure. Years of low rates, consistently the lowest in Alameda County, have <br />caused the costs of providing water and sewer service in Pleasanton to outpace revenue and <br />put the City behind in infrastructure investment. <br /> <br />The City’s Water Fund revenue was significantly impacted when three ground wells were shut <br />off due to per- and polyfluoroalkyl substances (PFAS) contamination, resulting in higher water <br />purchase costs. In fiscal year 2022/23, the Water Program was in a precarious financial <br />position such that the City could not meet its debt service coverage requirement for the 2017 <br />Water Revenue Bond, and the reserve level was below the 35% reserve target. <br /> <br />Measures Taken to Address Water and Sewer Funding Needs <br />In 2022, the City recognized the Water Fund would be insolvent (bankrupt) without quick <br />action. In November 2023, the City Council approved rate increases for calendar years 2024 <br />and 2025. The additional revenues are being utilized to support ongoing operations and fund <br />near-term improvement projects to increase water system capacity and reliability and begin to <br />address PFAS contamination of the City’s groundwater wells. However, with significant <br />deferred maintenance, resources still need to be identified to fund infrastructure improvements <br />such as pipe replacement and to ensure there are adequate reserves for emergency <br />situations. <br /> <br />The approved rate increases allowed the City to issue $19 million in new and necessary water <br />revenue bonds (see the City Council Agenda Packet from May 7, 2024 <br />at https://pleasantonca.portal.civicclerk.com/event/199/files/agenda/329) to fund near-term <br />improvement projects and the City’s partnership with Zone 7 on the Regional Groundwater <br />Facilities Project to address PFAS contamination. <br /> <br />The City is finalizing both Water and Sewer System Management Plans (the City's first <br />comprehensive water and sewer plans) to fully inform the infrastructure funding needs for the <br />Page 40 of 114
The URL can be used to link to this page
Your browser does not support the video tag.