My WebLink
|
Help
|
About
|
Sign Out
Pleasanton Parks and Recreation Master Plan
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PARKS AND RECREATION
>
2024
>
09122024
>
Pleasanton Parks and Recreation Master Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 3:09:42 PM
Creation date
9/5/2024 3:07:22 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />2-25 <br />Pleasanton Parks and Recreation Master Plan <br />Section Two – Recreation Facility Needs Assessment 2014 <br /> <br /> <br />Recreation Facility Requirements <br /> <br />The demand for certain recreation facilities is calculated based upon actual participation rates as <br />determined from the telephone survey. The facility demand for each of the selected activities is <br />determined based upon current and future population figures. The total facility demand is compared to <br />the existing facility inventory which results in a surplus or deficit. <br /> <br />Of the twelve (12) activities surveyed, ten (10) were identified as meeting needs or having a current <br />surplus of facilities. The remainder (skate park and dog park) show current deficits (see Exhibit 2.9‐3). <br /> <br /> <br />Exhibit 2.9‐3: Current Facility Needs (2013) <br /> <br />Facility 2013 Needs Existing City <br />Facilities <br />School <br />Facilities <br />Total <br />Facilities <br />Available <br />Total <br />Surplus/ <br />Deficit <br />Softball Fields Adult <br />& Youth <br />9.7* 13.0 0 13.0 3.3 <br />Baseball Fields: Organized Youth 19.0 19.0 0 19.0 0.0 <br />Football Fields: Organized Youth 1.9 3.0 0 3.0 1.1 <br />Soccer Fields: <br />Organized Youth <br />16.4 21.0 8 29.0 12.6 <br />Lacrosse: <br />Organized Youth <br />2.9 0.0 4 4.0 1.1 <br />Swimming Pools 3.9 3.1** 1*** 4.1 0.2 <br />Tennis Courts 27.9 18.0 10*** 28.0 .1 <br />Indoor Basketball Courts 5.9 0.0 7 7.0 1.1 <br />Walking/Jogging Paths 17.9 23.9 0 23.9 6.0 <br />Bicycle Paths 23.0 33.0 0 33.0 10.0 <br />Skate Parks 2.3 2.0 0 2.0 ‐0.3 <br />Dog Parks 2.3 1.0 0 1.0 ‐1.3 <br /> <br />Notes: <br />*Demand including non‐resident adults is 12.1 fields, resulting in a surplus of only 0.9 fields. <br /> <br />**One pool =25 meters x 25 yards or 6,150 sq. ft. Total recreational swimming square footage in City pools is <br />estimated to be 19,005 sq. ft. including recently renovated Dolores Bengtson Aquatic Center. Demand is <br />equivalent to 23,985 sq. ft. <br /> <br />***Values reflect that school facilities receive ½ credit due to school hours unavailability. These facilities have <br />limited access due to existing District Operations.
The URL can be used to link to this page
Your browser does not support the video tag.