My WebLink
|
Help
|
About
|
Sign Out
ORD 2284
City of Pleasanton
>
CITY CLERK
>
ORDINANCES
>
2201 - 2300
>
ORD 2284
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/3/2024 9:07:17 AM
Creation date
9/3/2024 9:06:12 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
ORDINANCES
DOCUMENT DATE
8/20/2024
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2284 <br />Page 29 of 40 <br />10 inches 0.0025 <br />12 inches 0.0020 <br />15 inches or larger 0.0015 <br />g. Maximum manhole spacing = 350 feet <br />h. Minimum curvature for curved sewer mains: 200 feet or not less than <br />recommended by pipe manufacturer <br />i. Minimum pipe cover = 5 feet <br />j. Peaking factor shall be Peak Wet Weather Flow divided by Average Dry Weather <br />k. flow (PF = PWWF/ADWF). Referring to the City's Wastewater Master Plan from <br />August 2007, PF shall be the average of the three events shown on Table 4.5 <br />"Inflow and Infiltration Analysis" for each subbasin. The Basin I.D. is from Figure <br />ES -3. Minimum allowable PF = 2.0. <br />I. Backflow prevention devices must be installed if the lowest plumbing fixture if the <br />building is lower than the downstream cleanout overflow device or manhole to <br />assure effluent discharge outside of the building in case the downstream pipe <br />network becomes obstructed. <br />m. Fats, Oils, and Grease (FOG) controls: Discharge of FOG to the City's sanitary <br />sewer system shall conform to Pleasanton Municipal Code Chapter 15.44. In <br />addition to other controls, a sampling manhole must be provided immediately <br />downstream of any grease interceptor in accordance with City Standard Drawing <br />402. <br />(Address this condition prior to subdivision plan approval) <br />79. POTABLE WATER SYSTEM DESIGN STANDARDS: All permanent connections to the <br />City's potable water network shall conform to Pleasanton Municipal Code §14.04.050. Any <br />required water pressure and/or flow needed by the applicant beyond that available from <br />the network at the point -of -connection must be provided by the applicant as a private <br />improvement on the customer side of the meter or backflow prevention device. All <br />extensions or upgrades to the potable water network shall be designed to satisfy the <br />following minimum standards: <br />a. Minimum number of valves: <br />i. 3 at cross intersections <br />ii. 2 at "T" intersections <br />iii. 500 feet maximum spacing <br />iv. 1 valve at each fire hydrant lateral <br />v. Pressure regulating valve station required between pressure zones <br />b. Minimum number of fire hydrants (subject to approval by Livermore -Pleasanton <br />Fire Department (LPFD) Fire Marshal <br />i. 1 hydrant within 250 feet of any existing or proposed structure <br />ii. 2 hydrants within 500 feet of any commercial, multi -family residential, <br />industrial, or school building <br />c. Minimum pipe size: 8 -inch diameter <br />d. Minimum depth of cover over pipe: 42 inches <br />e. Blowoff requirements: <br />i. At all dead ends whether temporary or permanent <br />ii. At all low points in the line <br />f. Maximum flow velocity: 10 feet per second (fps) <br />g. Minimum fire flows in gallons per minute (gpm): <br />i. 1,500 gpm for 2 hours (rural residential) <br />ii. 2,000 to 2,500 gpm for 2 hours (single family residential) <br />iii. 2,500 gpm for 2 hours (multi -family residential) <br />
The URL can be used to link to this page
Your browser does not support the video tag.