Ordinance No. 2284 <br />Page 22 of 40 <br />52 FOOTHILL ROAD STORM PIPES: The storm drain network relies on connections to or <br />extensions of existing storm drain pipes, one at the west end of Lot 89 where an existing <br />24" CMP passes beneath Foothill Road, and one at the south end of Parcel F where <br />connection to an existing 36" pipe is proposed. The condition of these existing pipes shall <br />be verified by the applicant through video inspection. If either pipe is deteriorated beyond <br />its service lift, then the replacement of the pipe, or rehabilitation in a manner acceptable <br />to the City Engineer, shall be included with the project. (Address this condition prior to <br />approval of the subdivision improvement plans) Project Specific Condition <br />53 DETENTION BASIN: Because the depth of water within the Parcel F detention basin will <br />rise above 18", it is considered a drowning risk for children. The California Building Code <br />requires said basins to be enclosed with a fence that includes self-closing, self -latching <br />gates with hardware elevated at least 54 inches from the ground to discourage easy <br />access by children. The fence must be at least 60" -high and have a maximum vertical <br />clearance of 2" from the ground to the bottom of the fence. There must be no gaps, <br />voids or other features that may allow a child under 5 years old to climb over. If a chain- <br />link fence is proposed, it must be non -climbable. (Address this condition prior to approval <br />of the subdivision improvement plans) Project Specific Condition <br />54 EMERGENCY OVERLAND FLOW: If the proposed network of ditches and pipes <br />become plugged or overwhelmed by a greater than 15 -year storm event, the site must <br />accommodate emergency overland flows without inundating any of the residential <br />structures. The greatest flooding threat will come from flows that originate west of <br />Foothill Road and then drain across the subdivision. The proposed development must be <br />designed to accommodate emergency flows (assumed to be the 50 -year storm <br />according to the City's design standards). (Address this condition prior to approval of the <br />subdivision improvement plans) Project Specific Condition <br />55 FEMA FLOOD ZONE: According to Sheet C-2, Lot 27 will include a new home within the <br />boundary of FEMA Flood Zone AH, although the pad will be filled to lift the home out of the <br />flood plain. The applicant is required to file a LOMR-F (letter of map revision based on fill) <br />with FEMA. Permits for this home cannot be issued until the LOMR-F has been approved <br />by FEMA, with a copy of said approval provided to the City. (Address this condition prior to <br />approval of the subdivision improvement plans) Project Specific Condition <br />56 SANITARY SEWER NETWORK MODELING: A site-specific analysis of the proposed <br />sanitary sewer network was commissioned with the City's consultant, Woodard & Curran. <br />Woodard & Curran's analysis offered the following recommendation: A manhole at the <br />Lemonwood Way intersection is suspected of splitting flows. Some of the flows continue <br />north on Muirwood while some are directed east on Lemonwood and then south into the <br />8" pipe that extends across the east end of the Merritt property. Woodard & Curran <br />recommends the split at Lemonwood Way be plugged such that all Muirwood flows <br />continue north. (Address this condition prior to approval of the subdivision improvement <br />plans) Project Specific Condition <br />57 WATER NETWORK MODELING: A site-specific analysis of the proposed water network <br />was commissioned with the City's consultant, Akel Engineering Group. Akel's analysis <br />offered the following recommendations: Pressures below 25 psi are expected at Lots 1, 2, <br />and 3 on the west side of the project and it is recommended a parallel main be constructed <br />to connect to the 510 Pressure Zone pipeline in Foothill Road. This will increase pressure <br />to approximately 34 psi during peak hours. Pressures at lots 1, 2, 3, 11, and 12 will be <br />below the criteria of 40 psi during peak hour demands. The low pressures range from 34 <br />