Laserfiche WebLink
Ordinance No. 2284 <br />Page 13 of 40 <br />38 SCHOOL IMPACT FEES — RESIDENTIAL NEW CONSTRUCTION: Applicant shall pay <br />school impact fees in accordance with the fee schedule established by Pleasanton <br />Unified School District. Written proof of compliance with this condition shall be provided <br />by applicant to the City, on a form generated by the PUSD, prior to building permit <br />issuance. <br />39 RECORDED DISCLOSURES: All lots covered by this approval shall include separately <br />recorded disclosure statements or restrictive covenants indicating the following: <br />a. Unless otherwise specified in the Design Guidelines and Development <br />Standards for the project, additions and/or modifications to the structures and <br />garages are prohibited. <br />b. Driveway parking shall be prohibited for any home where the driveway <br />lengths is less than 23 feet. In no circumstance shall parked vehicles be <br />permitted to overhang or obstruct sidewalks, paths, trails, driveways, or other <br />required access. Boats, trailers, campers, motor homes, and other <br />recreational vehicles are not allowed to be parked or stored on-site, unless <br />effectively screened from view from the street. <br />C. Garages shall not be modified or used for storage in a manner that would <br />interfere with the ability to park two cars within the garages of the units. <br />Project Specific Condition <br />d. Wording for these disclosures and covenants shall be written in simple/plain <br />language, shall be submitted to the City Attorney for review and approval <br />prior to recordation of the final map, and shall be recorded over the project <br />site by separate instrument. <br />40 CONDITIONS OF APPROVAL: The applicant shall provide all initial buyers with copies <br />of the final project conditions of approval. <br />Environmental <br />41 MITIGATION MEASURES/IMPLEMENTATION MEASURES: As indicated in the <br />project's Section 15183 Checklist, several mitigation measures identified in the Housing <br />Element Update FEIR are applicable to the proposed project: <br />• MM AIR -1 a <br />• MM AIR -1 b <br />• MM BIO -1 <br />• MM GEO-6 <br />• <br />MM HAZ-2 <br />• MM NOW <br />• MM TRANS 2 <br />The following measures from the Housing Element Update FEIR shall be implemented <br />MM AIR -1 a: Prior to the issuance of a grading or building permit, whichever is <br />sooner, the project applicant for a potential site for rezoning shall submit an air <br />quality construction plan detailing the proposed air quality construction measures <br />related to the project such as construction phasing, construction equipment, and <br />dust control measures, and such plan shall be approved by the Director of <br />Community Development. Air quality construction measures shall include Basic <br />Construction Mitigation Measures, as approved by the Bay Area Air Quality <br />Management District (BAAQMD) in 2017, and, where construction -related <br />emissions would exceed the applicable thresholds, Additional Construction <br />