Laserfiche WebLink
<br />Page 2 of 2 © Insurance Services Office, Inc., 2008 CG 25 03 05 09 † <br /> <br />B. For all sums which the insured becomes legally <br />obligated to pay as damages caused by "occur- <br />rences" under Section I – Coverage A, and for all <br />medical expenses caused by accidents under <br />Section I – Coverage C, which cannot be attri- <br />buted only to ongoing operations at a single des- <br />ignated construction project shown in the Sche- <br />dule above: <br /> 1. Any payments made under Coverage A for <br />damages or under Coverage C for medical <br />expenses shall reduce the amount available <br />under the General Aggregate Limit or the <br />Products-completed Operations Aggregate <br />Limit, whichever is applicable; and <br /> 2. Such payments shall not reduce any Desig- <br />nated Construction Project General Aggre- <br />gate Limit. <br />C. When coverage for liability arising out of the <br />"products-completed operations hazard" is pro- <br />vided, any payments for damages because of <br />"bodily injury" or "property damage" included in <br />the "products-completed operations hazard" will <br />reduce the Products-completed Operations Ag- <br />gregate Limit, and not reduce the General Ag- <br />gregate Limit nor the Designated Construction <br />Project General Aggregate Limit. <br />D. If the applicable designated construction project <br />has been abandoned, delayed, or abandoned <br />and then restarted, or if the authorized contract- <br />ing parties deviate from plans, blueprints, de- <br />signs, specifications or timetables, the project will <br />still be deemed to be the same construction <br />project. <br />E. The provisions of Section III – Limits Of Insur- <br />ance not otherwise modified by this endorsement <br />shall continue to apply as stipulated. <br />Docusign Envelope ID: 343D145E-2FCA-415A-85EB-2B28A2247676