My WebLink
|
Help
|
About
|
Sign Out
RES 2024055
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2024
>
RES 2024055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 12:48:45 PM
Creation date
8/1/2024 12:47:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/16/2024
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID: 3D940908-F9E6-4E95-8861-1EA134A568D0 <br />C. Irrigation scheduling; <br />d. Schedule of irrigation, landscape and irrigation maintenance; <br />e. Landscape irrigation audit report; and <br />f. Soil management report (if not previously submitted). <br />114. LANDSCAPING INSTALLATION: Prior to building permit final all landscaping shall be <br />installed as shown on the approved building permit set and shall be inspected and <br />approved by the Landscape Architecture Division. <br />115. PARKWAY STRIP LANDSCAPE AREAS: All parkways strip landscape areas (the <br />planting area between the sidewalk and the curb) are to be a minimum of four feet wide <br />from back of curb to face of sidewalk. Project Specific Condition <br />116. CONCRETE CURBS: 6 -inch vertical concrete curbs, with curb cuts or flush curbs with <br />wheel stops, if determined to be acceptable by the Director of Engineering/City <br />Engineer and Director of Community Development, shall be installed between all paved <br />and landscape areas, in conformance with the City's Standard Specifications and <br />Details. <br />117. PATHWAY CONNECTION: Court G shall have a pathway connection to Street E <br />Project Specific Condition <br />118. TRAIL EXTENSION: As detailed in the project Development Agreement, the applicant <br />shall be responsible for the design and completion of a Class 1, 10 -foot -wide trail <br />extension from the Project's southeastern trail connection to the existing trail at Foothill <br />Knolls Park to the Project's northern trail connection at Eastwood Way. The applicant <br />shall be solely responsible for all design, installation and ongoing maintenance costs of <br />the trail extension. Maintenance of the off-site trail improvements at the city park shall <br />be the responsibility of the city. Project Specific Condition <br />119. EROSION CONTROL: For purposes of erosion control, the applicant shall plant a hydro <br />seed mixture designed by the applicant's landscape architect and approved by the <br />Landscape Architecture Division prior to installation. The erosion control shall be <br />maintained by the applicant until permanent landscaping is in place. <br />120. BACKFLOW AND IRRIGATION METER SCREENING: All backflow prevention devices <br />and above ground irrigation controls shall be located and screened to minimize their <br />visual impacts. These devices with their proposed screening shall be shown on the <br />landscaping and utility plans submitted with the building permit plans or improvement <br />plans and shall be subject to the review and approval of the City Landscape Architect <br />prior to their installation. If above -ground, they shall be painted forest green or an <br />equivalent dark -green color. Screens shall consist of berms, walls, or landscaping <br />satisfactorily integrated into the landscape plan. Landscape screens shall include <br />shrubbery designed by species and planting density to establish a complete screen <br />within 1 year from the date of planting. Weather protection devices, such as measures <br />P22-1089, PUD -147, Tract 8522 <br />41 <br />PC -2024-14, June 26, 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.