My WebLink
|
Help
|
About
|
Sign Out
RES 2024055
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2024
>
RES 2024055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 12:48:45 PM
Creation date
8/1/2024 12:47:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/16/2024
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID: 3D940908-FK64E95-8861-1EA134A568D0 <br />56 WATER NETWORK MODELING: A site-specific analysis of the proposed water network <br />was commissioned with the City's consultant, Akel Engineering Group. Akel's analysis <br />offered the following recommendations: Pressures below 25 psi are expected at Lots 1, <br />2, and 3 on the west side of the project and it is recommended a parallel main be <br />constructed to connect to the 510 Pressure Zone pipeline in Foothill Road. This will <br />increase pressure to approximately 34 psi during peak hours. Pressures at lots 1, 2, 3, <br />11, and 12 will be below the criteria of 40 psi during peak hour demands. The low <br />pressures range from 34 psi (Lots 1, 2, and 3) to 39 psi (Lots 11 and 12). Individual <br />booster pumps would be required for these lots. In addition, those lots served by <br />individual booster pumps shall enter into a Maintenance Covenant, Assumption of Risk, <br />Release of Claims, and Covenant Not to Sue in a form acceptable to the City Attorney's <br />Office in conformance with Pleasanton Municipal Code §14.04.050(E). Project Specific <br />Condition <br />57 EXISTING SEPTIC SYSTEMS: Any existing septic tanks within the property shall be <br />identified on the plans. Said systems must be properly abandoned in accordance with <br />Alameda County Code of Ordinances §15.18.070C. (Address this condition prior to <br />approval of the subdivision improvement plans) Project Specific Condition <br />58 GROUNDWATER WELLS: Any existing groundwater wells that will no longer be <br />needed for water supply to the existing home or irrigation shall be properly demolished <br />according to permit(s) issued by Zone 7 Water Agency in accordance with Alameda <br />County General Ordinance 0-2015-20. (Address this condition prior to approval of the <br />subdivision improvement plans) Project Specific Condition <br />59 CONDITIONS OF APPROVAL: These Conditions of Approval shall be depicted on a <br />plan sheet(s) in the submitted plans for construction. (Address this condition prior to <br />subdivision improvement plan approval) <br />60 ENGINEERING DIVISION FEES FOR SERVICE: The Engineering Division assesses <br />fees for services including plan -check, permit issuance, and inspection according to the <br />City's adopted Master Fee Schedule. These fees are separate and distinct from fees <br />assessed by the Community Development Department (including Planning and Building <br />Division fees). The applicant is responsible for payment of all Engineering Division fees <br />prior to services rendered or permit issuance, whichever is first. (Address this condition <br />prior to subdivision improvement plan approval) <br />61 CITY ENGINEER SIGNATURE BLOCK: The following signature block shall be <br />depicted on the first sheet of the plans submitted for construction: "Approval of these <br />plans is for work within the street right-of-way and public utility systems within Public <br />Services Easements unless otherwise noted. Approval of these plans does not release <br />the developer of the responsibility for the correction of mistakes, errors, or omissions <br />contained therein. If during the course of construction of the improvements public <br />interest requires a modification or a departure from the specification and details of the <br />City of Pleasanton or these plans, the City Engineer shall have the authority to require <br />P22-1089, PUD -147, Tract 8522 <br />25 <br />PC -2024-14, June 26, 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.