My WebLink
|
Help
|
About
|
Sign Out
RES 2024055
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2024
>
RES 2024055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 12:48:45 PM
Creation date
8/1/2024 12:47:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/16/2024
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID: 3D940908-F9E6-4E95-8861-1 EA134A568D0 <br />Pre -Construction Avian Survey — If Project construction -related activities take <br />place during the nesting season (February through August), preconstruction <br />surveys for all nesting birds (including waterfowl, passerines, raptors, and other <br />birds) within and adjacent to (within 1,000 feet) the Property should be conducted <br />by a competent biologist 14 days prior to the commencement of the tree removal <br />or site grading activities. Surveys should focus on areas where birds are likely to <br />nest, including trees, shrubs, grasslands, rock faces, stream banks, or under eves <br />of structures. If any bird listed under the Migratory Bird Treaty Act is found to be <br />nesting within the project site or within the area of influence, an adequate <br />protective buffer zone should be established by a qualified biologist to protect the <br />nesting site. This buffer shall be a minimum of 75 feet from the project activities for <br />small passerine birds, and a minimum of 250 feet for raptors. The distance shall <br />be determined by a competent biologist based on the site conditions (topography, <br />if the nest is in a line of sight of the construction and the sensitivity of the birds <br />nesting). The nest site(s) shall be monitored by a competent biologist periodically <br />to see if the birds are stressed by the construction activities and if the protective <br />buffer needs to be increased. Once the young have fledged and are flying well <br />enough to avoid project construction zones (typically by August), the project can <br />proceed without further regard to the nest site(s). Active nests, including those in <br />the process of being constructed shall not be disturbed. Surveys shall be repeated <br />in areas where Project activities lapse for a period of 7 days or more. <br />• Burrowing Owl Surveys — A burrowing owl pre -construction survey should take <br />place before any construction activities commence. Occupancy of burrowing owl <br />habitat is confirmed at a site when at least one burrowing owl or its sign at or near <br />a burrow entrance is observed within the last three years. If a burrowing owl or <br />sign is present on the Property three additional protocol level surveys will be <br />initiated. Once these surveys have been completed to identify the owl's location, <br />disturbance buffers should be placed around each active burrow. No disturbance <br />should occur within 250 feet of occupied burrows during the breeding season <br />(February 1 through August 31) and/or within 160 feet of occupied burrows during <br />non -breeding season (September 1 through January 31). Pre -construction surveys <br />shall be completed 14 days prior to initiating activities. <br />• Special -status Bats Surveys — For all Project activities planned in or adjacent to <br />potential bat roosting habitat, such as structures and/or involving woody vegetation <br />modification or removal of any and all trees, a qualified biologist shall conduct <br />daytime and evening acoustic surveys in addition to extensive visual surveys of <br />potential habitat for special -status bats at least 7 days prior to initiation of Project <br />activities. If bats are found on-site, a qualified biologist shall identify the species, <br />estimated quantity present, roost type, and roost status, but shall avoid disturbing <br />bats during surveys. A qualified biologist shall also create a Bat Mitigation and <br />Monitoring Plan if special -status bat species are detected prior to the start of <br />Project activities. The Bat Mitigation and Monitoring Plan shall include: (1) an <br />assessment of all Project impacts to special -status bats, including noise <br />P22-1089, PUD -147, Tract 8522 <br />19 <br />PC -2024-14, June 26, 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.