My WebLink
|
Help
|
About
|
Sign Out
RES 2024055
City of Pleasanton
>
CITY CLERK
>
RESOLUTIONS
>
2020-present
>
2024
>
RES 2024055
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2024 12:48:45 PM
Creation date
8/1/2024 12:47:31 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
7/16/2024
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Docusign Envelope ID: 3D940908-F9E6-4E95-8861-1 EA134A568D0 <br />drawings and plan details, including color and material of the enclosures noted, shall be <br />included in the building permit submittal and shall be subject to the review and approval <br />of the Director of Community Development prior to building permit issuance. <br />22 RECYCLING AND COMPOSTING PROGRAMS: The project shall comply with the <br />current City/Pleasanton Garbage Service recycling and composting programs. <br />Green Building and Sustainabilitv Measures <br />23 Climate Action Plan 2.0 Compliance: Prior to building permit issuance, a GHG Emission <br />Compliance Checklist shall be provided, to the Planning Division for review and <br />approval by the Director of Community Development. The measures shall be shown on <br />the building permit plans submitted to the Building and Safety Division. The Checklist <br />shall include notation indicating the sheet(s) the measure can be found. Prior to building <br />permit final, all of the measures indicated on the approved checklist shall be inspected <br />and approved by the City of Pleasanton. <br />24 ALL -ELECTRIC: This project is to have no new gas infrastructure installed. This shall be <br />noted on the plans submitted for Building Permits. <br />Construction Practices and Noticing <br />25 WORK HOURS: All demolition and construction activities, inspections, plan checking, <br />material delivery, staff assignment or coordination, etc., shall be limited to the hours of <br />8 a.m. to 5 p.m., Monday through Saturday. No construction shall be allowed on State <br />or Federal Holidays or Sundays. The Director of Community Development may allow <br />earlier "start times" or later "stop times" for specific construction activities. All <br />construction equipment shall meet Department of Motor Vehicles (DMV) noise <br />standards and shall be equipped with muffling devices. Prior to construction, the hours <br />of construction shall be posted on site. <br />26. CONSTRUCTION PARKING: Campers, trailers, motor homes, or any other similar <br />vehicle are not allowed on the construction site except when needed as sleeping <br />quarters for a security guard subject to receipt of a temporary conditional use permit <br />(per PMC 18.116.010.E). <br />27. CONSTRUCTION TRAILERS: A construction trailer shall be allowed to be placed on <br />the project site for daily administration/coordination purposes during the construction <br />period. <br />28. CONSTRUCTION AND PARKING MANAGEMENT PLAN: The applicant shall prepare <br />a construction and parking management plan to address impacts and parking demands <br />during the construction phase of the project. The construction and parking management <br />plan shall be subject to review and approval by the City Traffic Engineer and Director of <br />Community Development prior to issuance of a demolition permit, or the first building <br />P22-1089, PUD -147, Tract 8522 <br />12 <br />PC -2024-14, June 26, 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.