Laserfiche WebLink
10 <br />Prior to starting further revisions to the designs, Mark Thomas will arrange a PDT meeting with City staff and <br />stakeholders to review the comments received, discuss any questions, and confirm the resolutions. <br />9 5 % Plans <br />The Mark Thomas team will incorporate all agreed upon comments received from the City and other agencies <br />into the design plan sheets submitted as directed in 65% PS&E and prepare 95% construction plans. It is <br />assumed that no major changes from the 65% design have been requested. <br />Toole will conduct a peer review of the 95% plans for adherence to best practices in bicycle and pedestrian <br />facility design. <br />9 5% Technical Specification <br />Mark Thomas will incorporate all agreed upon comments into the technical specifications that are specific to <br />the Project. Mark Thomas will also coordinate with the City to develop any language in the construction <br />contract special conditions, with the City leading this effort. <br />9 5% Construction Quantities and Cost Estimates <br />Mark Thomas will update the construction quantity estimate submitted during 65% PS&E and submit updated <br />quantity calculations showing all sketches, diagrams, and dimensions necessary for use by the City resident <br />engineer and field inspectors. Mark Thomas will provide an independent review by internal staff not associated <br />with the Project review and check quantity take-off calculations and cost estimates. <br />The 95% PS&E will be provided to the City for review and comment. <br />Task 6.3. 100% (Pre-final and Bid Set) PS&E <br />Upon receipt of a single set of non-conflicting comments from the City and reviewing agencies, the Mark <br />Thomas team will prepare a Comment-Response Matrix listing the comment, source, and proposed resolution. If <br />necessary, Mark Thomas will arrange a PDT meeting with City staff and stakeholders to review the comments <br />received, discuss any questions and confirm the resolutions. <br />Once the comment resolutions are agreed upon, Mark Thomas will update the PS&E to the 100% (pre-final) <br />design level. The 100% (pre-final) PS&E will be of sufficient detail for the City to use in bidding and constructing <br />the project improvements. The 100% (pre-final) plans and specifications will be signed and sealed by a <br />professional civil engineer in responsible charge of the work. Any comment by the City will be incorporated to <br />the 100% (Bid Set) PS&E. <br />Toole will conduct a peer review of the 100% (pre-final) plans for adherence to best practices in bicycle and <br />pedestrian facility design. <br />Bid Set PS&E will be submitted to the City in hardcopy and electronic format. Signed plans will be provided in <br />PDF format. AutoCAD files for the drawings will be provided if requested. Specifications will be provided <br />electronically in MS Word format. <br />Task 6.4. Landscape Design <br />Based on the final geometry and comments received on the 35% Package and Landscape Design Basis <br />Memorandum , Mark Thomas will prepare Landscape Architectural PS&E submittals at the 65%, 95%, 100% and Bid <br />Set levels of completion. <br />65% plans will include planting plans and irrigation plans (in AutoCAD, 20-scale) and coordination with the civil <br />team on existing trees to remain, hardscape layout, tree placement and biofiltration planting areas. Planting <br />plans will include tree, shrub, and groundcover locations, plant list, plant callouts and quantities, and associated <br />landscape construction details. Irrigation plans will include points of connection locations, mainline layout, <br />pressure loss calculations, irrigation equipment list, and associated details. <br />Docusign Envelope ID: CFB4D269-E371-4DA6-B769-59DDBD4C7856Docusign Envelope ID: B363250F-E21F-4652-B170-E77C9043D4FB