Laserfiche WebLink
5.04 Watering <br />Water enough so that moisture penetrates throughout the root zone as often as necessary <br />to maintain healthy growth. <br />5.05 Dead Plant Material <br />If large sections of plant material are damaged or destroyed due to vandalism, such <br />replacement material will be provided or paid for by the City but shall be installed by the <br />Contractor as "Extra Work". Documentation such as photos, a cost estimate, and a <br />Public Safety report for vandalism shall be provided to the City for such plant material. <br />Receipts for all plant material provided by the Contractor shall be given to the City. <br />5.06 Pest and Disease Control <br />All ornamental plant material will be inspected throughout the year to ensure against <br />disease, insect infestation, and pest damage. If an infestation occurs, appropriate plant <br />protection shall be taken. Should a pesticide be required, it shall be applied by a licensed <br />pesticide applicator by state and local regulations and as weather and environmental <br />conditions permit. Any pruning necessary to remove infested or infected material is <br />included in this contract at no additional cost. Gopher and squirrel abatement is included <br />in the scope of work and is considered as part of the basic landscape maintenance and <br />included in this contract at no extra cost. Pest and disease control shall be provided <br />throughout the entire cemetery, including both the areas highlighted in pink and <br />highlighted in purple on the attached Pioneer Cemetery Map, Exhibit B, at no <br />additional cost to the City. <br />A. Prior to applying any pesticides the Contractor shall have a"Commercial Pest <br />Control Operator's License" as required by law. <br />B. The spray materials shall meet all Federal, State and local requirements. <br />C. The Contractor shall use an insecticide spray that prevents or controls insect <br />infestations. <br />D. Application of pest and disease control materials shall be within the time best <br />suited, according to the manufacturer's specifications and application rates, <br />for the eradication of the insects and diseases. <br />E. Any new or existing plants or soil that are damaged by either the lack of a <br />needed application or the over-application of controlled materials shall be <br />replaced by the Contractor at his expense. <br />F. Snails and slugs shall be controlled by the use of an approved non-arsenical <br />metaldehyde bait as prescribed by a qualified pest control advisor. <br />G. Gopher and ground squirrel abatement shall be done per IPM standards. <br />5.07 Watering <br />Cemetery Scope of Work 2021 9-2 <br />rev4 Rev. 5/19/2023 Page 9 <br />DocuSign Envelope ID: 0513E5BC-7817-4751-AE43-17E4D02158EFDocusign Envelope ID: 60515C6D-2A85-44A4-822D-95AC35991C81