My WebLink
|
Help
|
About
|
Sign Out
TERRA LANDSCAPE/TREE SCULPTURE GROUP
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
T
>
TERRA LANDSCAPE/TREE SCULPTURE GROUP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2024 3:46:19 PM
Creation date
7/26/2024 11:39:44 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Landscape Maintenance
Contract Type
Amendment
NAME
TERRA LANDSCAPE/TREE SCULPTURE GROUP
Contract Record Series
704-05
Munis Contract #
2022364
Contract Expiration
6/30/2025
NOTES
2ND AMENDMENT - MAINTENANCE SERVICE FOR GROUNDS MAINTENANCE FOR PLEASANTON PIONEER CEMETERY
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.06 Drainage Systems Maintenance <br />A. All drainage systems on the properties for purposes of rain water or irrigation <br />water collection, whether surface swales or underground pipes, shall be <br />maintained in a clean condition free of debris, erosion waste, weeds or any <br />blockage. Natural creeks and streams are not included. <br />B. When a drainage system is blocked by debris from off the site or by erosion <br />waste from off-site major storm damage, correction will be made by the City <br />after prompt notification by the Contractor or considered"Extra Work"as <br />approved by the City. <br />3.07 Erosion Control <br />The Contractor shall not be responsible for structural maintenance or repair or <br />replacement of the following: parking areas, drive aisles, or sidewalks except for such <br />structural maintenance, repair or replacement resulting from damage caused by the <br />Contractor or his agents. <br />A. Erosion resulting from failure to maintain properly rooted plant material on <br />slopes shall be the responsibility of the Contractor to correct and accomplish <br />necessary cleanups. <br />B. Erosion resulting from major storm damage that requires major slope <br />reconstruction and/or installation of additional drainage facilities shall be the <br />City's responsibility. <br />3.08 Records <br />Written records of watering schedules, fertilization, pest control spraying, and other <br />maintenance work shall be maintained by the Contractor. Written records describing all <br />products and materials used during maintenance also shall be maintained by the <br />Contractor. A copy of the record shall be provided to the City on a monthly basis. <br />3.09 Control, Supervision and Approval Authority <br />A. Unless otherwise provided by specific provisions, Contractor's operations and <br />activities pursuant to this agreement shall be under the control and supervision <br />of the Director of Library and Recreation or her authorized representative, and <br />such person shall exercise such control and supervision for and on behalf of <br />the City where so designated in this agreement. <br />B. Whenever, under the provisions of this agreement, the Contractor is prohibited <br />from doing something unless Contractor first obtains the approval or consent <br />of the City, such approval and consent must be obtained from the Director of <br />Library and Recreation, or her authorized representative. <br />3.10 Graffiti <br />Cemetery Scope of Work 2021 9-2 <br />rev4 Rev.5/19/2023 Page 7 <br />DocuSign Envelope ID: 0513E5BC-7817-4751-AE43-17E4D02158EFDocusign Envelope ID: 60515C6D-2A85-44A4-822D-95AC35991C81
The URL can be used to link to this page
Your browser does not support the video tag.