Laserfiche WebLink
PUD-18-07M Planning Commission <br />Page 7 of 16 <br /> <br />subdivision map shall be coordinated by the applicant’s title company, with one full- sized mylar <br />copy of the recorded map returned to the City. <br /> <br />The following statement shall be included on the cover sheet of the map: “I, Adam Nelkie, <br />P.E., City Engineer of the City of Pleasanton, County of Alameda, State of California, <br />do hereby state that I have examined the herein embodied map entitled “[MAP <br />NAME/NUMBER]” consisting of [NUMBER OF SHEETS] sheets, this statement being <br />on Sheet 1 thereof and that the [PARCEL OR TRACT] map was presented to me as <br />provided by local ordinance. This map conforms with the requirements of the Subdivision <br />Map Act and of any local ordinances applicable at the time of approval of the tentative <br />map, and the subdivision as shown is substantially the same as it appeared on the <br />tentative map, if any, and any approved alterations thereof. The name of the subdivider <br />is as shown on the statement of owner upon this sheet.” <br /> <br />The Public Service Easement (PSE) and Emergency Vehicle Access Easement (EVAE) <br />were not explicitly accepted by the City Engineer on Parcel Map 8099. Final Parcel Map <br />11413 shall again grant those same easements so they can be formally accepted across <br />Lots 1 and 2. <br /> <br />For parcel maps, add the following: “The dedications and/or easements shown as [LIST] <br />upon said map thereon offered for dedication are hereby accepted for the purpose for which <br />offered.” <br />Adam Nelkie, P.E., Registration No. 78830, City Engineer, City of Pleasanton, County of <br />Alameda, State of California [SIGNATURE LINE], [DATE], [SPACE FOR STAMP]” <br />(Address this condition prior to plan approval. <br />44. CITY SURVEYOR: The City utilizes the services of an outside consultant to certify <br />the technical accuracy of subdivision maps as City Land Surveyor pursuant to California <br />Government Code §66451.1. In order to provide this service, the consultant will submit a <br />proposal to the City for the estimated cost of the work. The estimate will be presented to <br />the applicant together with the City’s administrative markup according to the City’s <br />adopted Master Fee Schedule. Review of the subdivision map cannot commence until <br />the applicant has submitted payment to the City for these costs. If the ultimate fee at the <br />conclusion of the work is less than this payment, the applicant will be refunded the <br />difference. If the ultimate fee is more than this payment, then the applicant shall submit <br />payment for the difference before the consultant certifies the map. <br /> <br />The following statement shall be included on the cover sheet of the map: “I, [NAME <br />PROVIDED BY CITY], P.L.S, Acting City Surveyor for the City of Pleasanton, Alameda <br />County, California, do hereby state that I have examined this map entitled “[MAP <br />NAME/NUMBER]”, and I am satisfied that said map is technically correct. <br /> [SIGNATURE LINE], [DATE], [SPACE FOR STAMP]” (Address this condition prior <br />to map approval) <br /> <br />Docusign Envelope ID: 7FA835AA-907F-44E8-8602-4A3F13DD08A0