Laserfiche WebLink
<br /> <br /> <br />7 of 7 <br /> <br />• Require proposed project to install radar speed sign in both the northbound and <br />southbound direction to slow traffic to increase the time between vehicles. <br />• Upon completion of construction, staff will re-evaluate the sight distance and delay for <br />motorists in the AM and PM peak hours. If the left turn delay average is found to be <br />greater than 4 minutes per vehicle, the Traffic Engineer will elevate the priority of the <br />Muirwood Drive South signal on the signal priority list. The left turn exit volume will be <br />added to the Muirwood Drive South volume and engineering judgement will be used to <br />provide additional points in the signal priority matrix. A signal at Muirwood Drive South <br />will provide an alternate method to gain access to southbound Foothill Road. <br /> <br />