My WebLink
|
Help
|
About
|
Sign Out
PC-2024-14
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PLANNING
>
RESOLUTIONS
>
2020 - PRESENT
>
2024
>
PC-2024-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/11/2024 9:23:49 AM
Creation date
7/11/2024 9:23:13 AM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
RESOLUTIONS
DOCUMENT DATE
6/26/2024
DESTRUCT DATE
PERMANENT
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br />P22-1089, PUD-147, Tract 8522 PC-2024-14, June 26, 2024 <br /> <br />43 <br /> <br />126. TREE BOND: Any tree affected by development/construction must be protected per the <br />Municipal Code. The applicant shall post cash, letter of credit, or other security <br />satisfactory to the Director of Engineering/City Engineer, for all Heritage Trees and any <br />other significant tree as deemed by the City Landscape Architect. This bond or security <br />will be for the value of the tree(s), up to a maximum of $100,000, and shall be held for a <br />minimum of 1 year following acceptance of public improvements or completion of <br />construction, whichever is later, and shall be forfeited if the trees are destroyed or <br />substantially damaged. An arborist shall be onsite during any tree work (i.e. root <br />pruning, trimming, setting up tree protection, etc.). The bond or security may be <br />released early with a certification letter by the arborist confirming he/she was present <br />during said tree work and work was performed in accordance with the arborist’s <br />recommendations. <br /> <br />127. STREET TREES: Each lot shall have a minimum of one street tree with corner lots <br />required to have three street trees. The final tree selection shall be subject to the review <br />and approval of the City Landscape Architect. Project Specific Condition <br /> <br />128. ROOT CUTTING: The applicant shall comply with the following tree root cutting <br />requirements: <br /> <br />a. Roots 1-inch in diameter or larger to be removed shall be cleanly cut with a <br />hand saw. Roots smaller than 1-inch in diameter are not considered to be <br />significant and may be removed by the most efficient means. <br />b. Roots larger than 2-inches in diameter and within 8-feet of the tree trunk shall <br />not be cut or ground unless prior approval has been received from the <br />Landscape Architecture Division. <br />c. Roots of any diameter farther than 8-feet from the tree trunk, which are in <br />conflict with the proposed work may be ground a maximum of one-half of their <br />diameter. Work of this nature shall only be performed using a mechanical <br />stump grinder and only by personnel familiar with its operation. <br />d. Roots up to 6-inches in diameter and farther than 8-feet from the tree trunk <br />may be removed if they are in conflict with the proposed work. Roots that are <br />removed shall be cleanly cut using a hand saw. <br /> <br />129. ROOT CONTROL BARRIER: The applicant shall provide root control barriers and 4- <br />inch perforated pipe for all trees located within 8-feet of pavement or other hardscape, <br />determined by the City Landscape Architect. Root barriers shall be located along the <br />edge of the pavement wherever the tree is within 8-feet of pavement or hardscape. <br />Information and details shall be included in the landscape plan submittal for review and <br />approval by the Landscape Architecture Division. <br /> <br />130. TREE PRUNING: Pruning shall be conducted by a certified arborist familiar with the <br />International Society of Arboriculture (ISA) pruning guidelines and shall comply with the <br />guidelines established by the ISA, Tree Pruning Guidelines, current edition, to maintain <br />the health of the trees. <br />Docusign Envelope ID: 3D940908-F9E6-4E95-88B1-1EA134A568D0
The URL can be used to link to this page
Your browser does not support the video tag.