Laserfiche WebLink
<br /> <br /> <br /> <br />P22-1089, PUD-147, Tract 8522 PC-2024-14, June 26, 2024 <br /> <br />41 <br /> <br />c. Irrigation scheduling; <br />d. Schedule of irrigation, landscape and irrigation maintenance; <br />e. Landscape irrigation audit report; and <br />f. Soil management report (if not previously submitted). <br /> <br />114. LANDSCAPING INSTALLATION: Prior to building permit final all landscaping shall be <br />installed as shown on the approved building permit set and shall b e inspected and <br />approved by the Landscape Architecture Division. <br /> <br />115. PARKWAY STRIP LANDSCAPE AREAS: All parkways strip landscape areas (the <br />planting area between the sidewalk and the curb) are to be a minimum of four feet wide <br />from back of curb to face of sidewalk. Project Specific Condition <br /> <br />116. CONCRETE CURBS: 6-inch vertical concrete curbs, with curb cuts or flush curbs with <br />wheel stops, if determined to be acceptable by the Director of Engineering/City <br />Engineer and Director of Community Development, shall be installed between all paved <br />and landscape areas, in conformance with the City’s Standard Specifications and <br />Details. <br /> <br />117. PATHWAY CONNECTION: Court G shall have a pathway connection to Street E. <br />Project Specific Condition <br /> <br />118. TRAIL EXTENSION: As detailed in the project Development Agreement, the applicant <br />shall be responsible for the design and completion of a Class 1, 10-foot-wide trail <br />extension from the Project’s southeastern trail connection to the existing trail at Foothill <br />Knolls Park to the Project’s northern trail connection at Eastwood Way. The applicant <br />shall be solely responsible for all design, installation and ongoing maintenance costs of <br />the trail extension. Maintenance of the off-site trail improvements at the city park shall <br />be the responsibility of the city. Project Specific Condition <br /> <br />119. EROSION CONTROL: For purposes of erosion control, the applicant shall plant a hydro <br />seed mixture designed by the applicant’s landscape architect and approved by the <br />Landscape Architecture Division prior to installation. The erosion control shall be <br />maintained by the applicant until permanent landscaping is in place. <br /> <br />120. BACKFLOW AND IRRIGATION METER SCREENING: All backflow prevention devices <br />and above ground irrigation controls shall be located and screened to minimize their <br />visual impacts. These devices with their proposed screening shall be shown on the <br />landscaping and utility plans submitted with the building permit plans or improvement <br />plans and shall be subject to the review and approval of the City Landscape Architect <br />prior to their installation. If above-ground, they shall be painted forest green or an <br />equivalent dark-green color. Screens shall consist of berms, walls, or landscaping <br />satisfactorily integrated into the landscape plan. Landscape screens shall include <br />shrubbery designed by species and planting density to establish a complete screen <br />within 1 year from the date of planting. Weather protection devices, such as measures <br />Docusign Envelope ID: 3D940908-F9E6-4E95-88B1-1EA134A568D0