Laserfiche WebLink
<br /> <br /> <br /> <br />P22-1089, PUD-147, Tract 8522 PC-2024-14, June 26, 2024 <br /> <br />11 <br /> <br />15. BUILDING SURVEY: The applicant shall submit a building survey and/or record of <br />survey and a site development plan in accordance with the provisions of Chapter 18.68 <br />of the PMC. These plans shall be approved by the Chief Building Official prior to <br />building permit issuance. The site development plan shall include all required <br />information to design and construct site, grading, paving, drainage, and utilities. <br /> <br />16. PAD AND SETBACK CERTIFICATION: The applicant shall submit a pad elevation <br />certification prepared by a California licensed land surveyor or registered civil engineer <br />to the Chief Building Official and Director of Community Development certifying the pad <br />elevations and building locations (setbacks) are conforming to the approved plans, prior <br />to receiving a foundation inspection for the structures. <br /> <br />17. BUILDING HEIGHT CERTIFICATION: The applicant shall submit a building height <br />certification prepared by a California licensed land surveyor or civil engineer to the <br />Director of Community Development before the first framing or structural inspection by <br />the Building and Safety Division. The height of the structures shall be surveyed and <br />verified as being in conformance to the approved building heights as shown on Exhibit B <br />or as otherwise conditioned. <br /> <br />18. FINAL INSPECTION: Final inspection by the Planning Division is required prior to <br />occupancy. <br /> <br />19. TRANSFORMERS: New electrical transformers shall be placed underground, or <br />aboveground and screened from view to the satisfaction of the Director of Community <br />Development. Details of the new electrical transformers, and any screening <br />architecturally compatible with the building, shall be included in the building permit <br />submittal and shall be subject to the review and approval of the Director of <br />Engineering/City Engineer and Director of Community Development prior to building <br />permit issuance. <br /> <br />20. MECHANICAL EQUIPMENT – SCREENING: The applicant shall effectively screen <br />from view all ducts, meters, air conditioning equipment, and any other mechanical <br />equipment, whether on the structure, on the ground, or on the roof, with materials <br />architecturally compatible with the building. Screening details shall be shown on the <br />plans submitted for building permit, the adequacy of which shall be determined by the <br />Director of Community Development. All required screening shall be installed prior to <br />final occupancy. <br /> <br />21. TRASH ENCLOSURE: All trash, refuse, and recycling shall be contained completely <br />within enclosures. Containers shall be stored within the enclosures at all times except <br />when being unloaded. The enclosures shall be sized to accommodate trash, recycling, <br />and green waste containers in compliance with the Alameda County Mandatory <br />Recycling Ordinance. The materials and colors of any new enclosures shall match or be <br />compatible with the primary building on site and the gates shall be metal or solid wood <br />unless otherwise approved by the Director of Community Development. Elevation <br />Docusign Envelope ID: 3D940908-F9E6-4E95-88B1-1EA134A568D0