My WebLink
|
Help
|
About
|
Sign Out
ITEM 23 ATTACHMENT 7 - PC Agenda Report
City of Pleasanton
>
CITY CLERK
>
AGENDA PACKETS
>
2024
>
071624
>
ITEM 23 ATTACHMENT 7 - PC Agenda Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 12:12:53 PM
Creation date
7/8/2024 12:12:19 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/16/2024
DESTRUCT DATE
15Y
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P22-1089, PUD-147 and Tract 8522, Merritt Planning Commission <br />31 of 33 <br />• No fee credits are to be provided to the applicant for the proposed Foothill Road bike <br />and pedestrian improvements or the Marilyn Murphy Kane trail extension improvements <br />• Construction and annual maintenance, in perpetuity, of the Marilyn Murphy Kane trail <br />extension as follows: <br />o Substantially complete to the satisfaction of the City Engineer, prior to issuance <br />of 50th home building permit, or within 4 years of issuance of first building permit, <br />whichever comes first <br />• Construction of Foothill Road bike and pedestrian improvements beyond the project <br />frontage as follows: <br />o improvements to allow for safe ingress/egress to the site from Foothill Road, <br />including roadway widening and creation of the required left-term pocket and <br />other related improvements necessary in determination of the City Traffic <br />Engineer, to be installed prior to issuance of first Certificate of Occupancy. Other <br />Foothill Road bike and pedestrian improvements to be “substantially complete” to <br />the satisfaction of the City Traffic Engineer, prior to issuance of 50th home <br />building permit, or within 4 years of issuance of first building permit, whichever <br />comes first. <br />• A Public Safety facility and equipment contribution to the City in the amount of $1 million <br />to be paid as follows: <br />o $200,000 to be paid at first building permit; $400,000 at time of issuance of 50th <br />home’s building permit; and $400,000 at Building Permit for the 100th home <br />building permit <br /> <br />Based on these terms staff has determined the City will receive at least equitable financial and <br />other public benefits over the initial term of the DA, compared to the value of terms that are to <br />the benefit of the developer, that leads staff to recommend support of the draft DA. In <br />particular, the City would secure additional multimodal improvements along Foothill Boulevard <br />and within the project in the form of a trail extension, would receive a direct financial <br />contribution in the amount of $1 Million to support provision of needed public safety <br />improvements and equipment, and would also receive payment of Capital Facilities and <br />Transportation Impact Fees to help offset the demands created on City facilities by the <br />incremental addition of new residents to the City. Finally, although on-site affordable housing is <br />a goal of the IZO, staff recognizes that the existing ordinance permits payment of fees, and so <br />achieving on-site units is a positive benefit of the project. Accordingly, staff recommends the <br />Planning Commission make a recommendation of support for the draft DA to the City Council. <br />Staff notes, the DA process requires the City Council to determine if a DA is consistent with the <br />General Plan. Based on the information above, staff believes the City Council will be able to <br />make this finding. <br /> <br />Annexation <br />The project site is designated as Site 22 in the City’s Housing Element. The project site is <br />located just outside of the City limits but within Pleasanton’s Sphere of Influence (SOI) and <br />Urban Growth Boundary (UGB). Prior to development of the proposed project, the project site <br />would need to be annexed into the City of Pleasanton, and a segment of Foothill Road in <br />Alameda County abutting the project site, consistent with City and LAFCO policies as well as <br />Program 1.10 of the Housing Element. Annexation of the project site and adjacent right of way <br />would represent a logical and orderly extension of urban growth and the City’s boundaries, <br />which would ensure the project site would be developed in a comprehensive and thoughtful <br />manner consistent with other nearby lands. Moreover, as the City processes development
The URL can be used to link to this page
Your browser does not support the video tag.