My WebLink
|
Help
|
About
|
Sign Out
TREE SCULPTURE GROUP DBA TERRA LANDSCAPE
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
T
>
TREE SCULPTURE GROUP DBA TERRA LANDSCAPE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2024 10:52:48 AM
Creation date
7/8/2024 10:52:45 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Maintenance Services
Contract Type
Amendment
NAME
TREE SCULPTURE GROUP DBA TERRA LANDSCAPE
Contract Record Series
704-05
Munis Contract #
2022534
Contract Expiration
6/30/2025
NOTES
2ND AMENDMENT - MAINTANENCE SERVICES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A - Scope of Work 2024 <br />Rev. 6/4/2024 Page 2 <br /> <br /> <br />SCOPE OF WORK <br /> <br />(To be used in conjunction with <br /> the City Standard Specifications and Standard Details, and <br /> the State Standard Specifications and Standard Plans) <br /> <br />All work shall be in accordance with the City of Pleasanton’s Standard Specifications and <br />Details dated November 2016. <br /> <br />All work not specifically called out as “Extra Work” or “Weed Abatement Work” in the <br />below scope of work sections shall be considered “Basic Maintenance”. <br /> <br />Item Description Quantity Unit Unit Price Total <br /> <br />1984-1 PONDEROSA* <br />1. Basic Maintenance 12 Month $205.00 $2,460.00 <br />2. General Benefit Maintenance 12 Month $611.00 $7,332.00 <br />3. Extra Work 1 Allowance $5,000.00 $5,000.00 <br /> Total: $14,792.00 <br />1993-1 WINDSOR** <br />1. Basic Maintenance 12 Month N/A N/A <br />2. Weed Abatement 1 LS N/A N/A <br />3. Extra Work 1 Allowance $12,000.00 $12,000.00 <br /> Total: $12,000.00 <br />1993-2 BONDE RANCH** <br />1. Basic Maintenance 12 Month $500.00 $6,000.00 <br />2. Weed Abatement 1 LS $11,502.00 $11,502.00 <br />3. Extra Work 1 Allowance $6,000.00 $6,000.00 <br /> Total: $25,574.00 <br />1994-1 OAK TREE FARM <br />1. Basic Maintenance 12 Month $600.00 $7,200.00 <br />2. Weed Abatement 1 LS $7,074.00 $7,074.00 <br />3. Extra Work 1 Allowance $4,000.00 $4,000.00 <br /> Total: $16,713.00 <br />1995-1 MOLLER RANCH <br />1. Basic Maintenance 12 Month $2,030.00 $24,360.00 <br />2. Weed Abatement 1 LS $6,203.00 $6,203.00 <br />3. Extra Work 1 Allowance $25,000.00 $25,000.00 <br /> Total: $55,563.00 <br /> <br /> Grand Total: $124,642 <br /> <br />EXHIBIT A <br />DocuSign Envelope ID: DB05D9D6-4CD9-4943-8B71-24A22DAB6AE1DocuSign Envelope ID: AE98610C-349A-4186-95B2-BB21BC8BFCEA
The URL can be used to link to this page
Your browser does not support the video tag.