My WebLink
|
Help
|
About
|
Sign Out
PARKS AND RECREATION COMMISSION MEETING AGENDA PACKET 07112024
City of Pleasanton
>
BOARDS AND COMMISSIONS
>
PARKS AND RECREATION
>
2024
>
07112024
>
PARKS AND RECREATION COMMISSION MEETING AGENDA PACKET 07112024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2024 4:51:15 PM
Creation date
7/3/2024 4:49:49 PM
Metadata
Fields
Template:
CITY CLERK
CITY CLERK - TYPE
AGENDA REPORT
DOCUMENT DATE
7/11/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 4 of 7 <br /> <br />Alviso Adobe <br />• The entire fence surrounding, and within the Alviso Adobe, was repainted by a <br />contractor. The fence had not been painted since the park opened in 2008. The paint <br />will help preserve the wood and improve the overall park aesthetics. <br />• Parks staff worked with the Landscape Architect to come up with a planting plan to <br />restore the landscaped area at the south end of the Alviso Adobe building following the <br />completion of the wall repair on the adobe. The plants were installed by staff. <br /> <br />Augustin Bernal Park <br />At the Augustin Bernal Park staging area, approximately 1,300 linear feet of pressure-treated <br />lumber fencing around the parking area was replaced. Over the years the posts and <br />crossmembers rotted out. The fencing keeps cars from parking outside of the designated <br />parking area. <br /> <br />Medians and Trails <br />• The medians and trails staff planted ninety-one (91) trees along the streets and in <br />medians. Newly planted trees are typically hand-watered in the summers for the first <br />three years after planting if no irrigation system is readily available. <br />• Staff spent two days at Augustin Bernal Park along the Toyon Trail removing a pirated <br />mountain bike trail. <br />• Terra Landscape, our median maintenance contractor, relocated an irrigation point of <br />connection on Morganfield Rd. and Santa Rita to back feed water to a section of <br />landscape along the sound wall that had no irrigation due to an irrigation mainline leak <br />that was not repairable. This creative solution to irrigate this area saved money by not <br />having to add a new meter and point of connection on Mohr Ave. <br />• A burglar attempted to steal two irrigation backflow devices from Valley Ave. They got <br />as far as cutting the pipe but then gave up. Replacements were installed along with <br />protective metal cages. There are easily over 100 unprotected city backflows in the <br />parks and medians that are subject to theft. Hopefully, this trend will not continue. <br /> <br /> Callippe Preserve Golf Course <br />• New golf course maintenance equipment that was approved by City Council on <br />November 7, 2023, was delivered. The order included two heavy duty utility carts, two <br />fairway mowers, 5 electric utility carts and one electric bunker rake. <br />• The construction of a new wedding ceremony site was completed outside of the <br />clubhouse. The location provides views of the course and the valley below. <br /> <br />Lund Ranch Open Space <br />• An additional water trough was installed in the southeast pasture. The original grazing <br />management plan neglected to call for a trough in this pasture. All four pastures now <br />have a water source for cattle grazing. <br />Page 9 of 33
The URL can be used to link to this page
Your browser does not support the video tag.