Laserfiche WebLink
Page 2 of 7 <br />closed. <br />• The Support Services Division had all the restrooms painted in time for the opening day <br />of baseball and softball. <br />• Nine pecan trees were planted within the park. This is a new tree species to the park. <br />Pecan trees appear here and there in the older parts of the city. This is our first attempt <br />using them as park trees. Pecan trees can reach up to 100 feet in height when fully <br />mature under ideal growing conditions. <br /> <br />Amador Valley Community Park <br />• In March a broken mainline at the soccer fields was repaired. The break occurred at a <br />difficult location near a bank of irrigation valves. The repair provided the opportunity to <br />rebuild the valve manifold and replace seven of the old irrigation valves. <br />• Five linden trees along Black Avenue were removed. The trees had extensive decay <br />throughout. The trees will be replaced in a 1:1 ratio in the park. <br /> <br />Val Vista Community Park <br />• Staff installed cobbles in concrete around many of the storm drains in the planter areas. <br />In addition to improving aesthetics, this will help keep mulch from going down the storm <br />drain. <br />• New Hungarian oak trees were planted to replace the diseased pear trees that were <br />removed near the meadow/community garden area. <br />• Staff renovated two planters near the restroom between the soccer fields. Staff removed <br />existing deer grass, graded the area, installed approximately 200 plants, retrofitted <br />irrigation, and mulched the area. <br /> <br />Muirwood Community Park <br />• Parks staff installed additional pickleball paddle holders to meet the demands of the <br />very busy pickleball courts. <br />• Two additional picnic tables were installed between the playground and the tennis <br />courts. <br /> <br />Bernal Community Park <br />• Three new trash cans were placed on the synthetic grass fields based on community <br />litter complaints. They were added to the trash contract for service. <br />• Windsails in the Phase 2 playground were replaced. Several of the windsails were <br />damaged by high winds over the past two winters. <br /> <br />Upper Field Park <br />• A new concrete apron was installed near the entrance to the northeast softball field. <br />Page 7 of 33