Laserfiche WebLink
P22-1089, PUD-147 and Tract 8522, Merritt Planning Commission <br />31 of 33 <br />o Substantially complete to the satisfaction of the City Engineer, prior to issuance <br />of 50th home building permit, or within 4 years of issuance of first building permit, <br />whichever comes first <br />• Construction of Foothill Road bike and pedestrian improvements beyond the project <br />frontage as follows: <br />o improvements to allow for safe ingress/egress to the site from Foothill Road, <br />including roadway widening and creation of the required left -term pocket and <br />other related improvements necessary in determination of the City Traffic <br />Engineer, to be installed prior to issuance of first Certificate of Occupancy. Other <br />Foothill Road bike and pedestrian improvements to be “substantially complete” to <br />the satisfaction of the City Traffic Engineer, prior to issuance of 50th home <br />building permit, or within 4 years of issuance of first building permit, whichever <br />comes first. <br />• A Public Safety facility and equipment contribution to the City in the amount of $1 million <br />to be paid as follows: <br />o $200,000 to be paid at first building permit; $400,000 at time of issuance of 50 th <br />home’s building permit; and $400,000 at Building Permit for the 100th home <br />building permit <br /> <br />Based on these terms staff has determined the City will receive at least equitable financial and <br />other public benefits over the initial term of the DA, compared to the value of terms that are to <br />the benefit of the developer, that leads staff to recommend support of the draft DA. In <br />particular, the City would secure additional multimodal improvements along Foothill Boulevard <br />and within the project in the form of a trail extension, receive a direct financial contribution in <br />the amount of $1 Million to support provision of needed public safety improvements and <br />equipment, and would also receive payment of Capital Facilities and Transportation Impact <br />Fees to help offset the demands created on City facilities by the increm ental addition of new <br />residents to the City. Finally, although on-site affordable housing is a goal of the IZO, staff <br />recognizes that the existing ordinance permits payment of fees, and so achieving on -site units <br />is a positive benefit of the project. Accordingly, staff recommends the Planning Commission <br />make a recommendation of support for the draft DA to the City Council. Staff notes, the DA <br />process requires the City Council to determine if a DA is consistent with the General Plan. <br />Based on the information above, staff believes the City Council will be able to make this <br />finding. <br /> <br />Annexation <br />The project site is designated as Site 22 in the City’s Housing Element. The project site is <br />located just outside of the City limits but within Pleasanton’s Sphere of Influence (SOI) and <br />Urban Growth Boundary (UGB). Prior to development of the proposed project, the project site <br />would need to be annexed into the City of Pleasanton, and a segment of Foothill Road in <br />Alameda County abutting the project site, consistent with City and LAFCO policies as well as <br />Program 1.10 of the Housing Element. Annexation of the project site and adjacent right of way <br />would represent a logical and orderly extension of urban growth and the City’s boundaries, <br />which would ensure the project site would be developed in a comprehensive and thoughtful <br />manner consistent with other nearby lands. Moreover, as the City processes development <br />applications consistent with the Housing Element Update for the project site, these applications <br />are reviewed by the City for compliance with the goals, policies, and programs of the General <br />Plan and Municipal Code. Furthermore, LAFCO would review the development applications for <br />the project site to ensure consistency with LAFCO policies.