Laserfiche WebLink
<br /> <br />Contractor’s methodology is thoroughly described and demonstrated to remove biofilm. Hydraulic <br />jetting will not be considered. The brushing shall be vigorous enough to remove biofilm without <br />damaging the liner or coating or causing excess visible turbidity. <br /> <br />The silt and debris shall be removed from the reservoir bottom and side slopes without damaging <br />the liner. Dichlorination, disposal of water, filtration and sediment management shall be in <br />accordance with Part II Section 4.B Dichlorination, Disposal of Water, Filtration and Sediment <br />Management. <br /> <br />Sediment removal will be considered complete only when an unobstructed view of the storage <br />bottom is achieved. Sufficient still photos are to be taken to demonstrate compliance. No cross <br />connection shall exist between the potable water storage facility and the vehicle or tank used to <br />store or transport the sediments removed from the potable water storage facility. Cross-connection <br />backflow prevention control measures shall be employed to avoid potential cross-connection <br />incidences from occurring. <br /> <br />D. Inspection Report and Video <br />For each facility, the Contractor shall submit two (2) copies of a written inspection report and <br />provide an inspection video and sufficient still color photographs to provide a reasonable <br />documentation of the condition of the potable water storage facility interior before and after <br />completion of work. <br /> <br />1) Tank and Reservoir Inspection Video and Report. <br />a) A schematic drawing of the tank and reservoir shall be included with the report. The <br />reservoir shall be divided into sections and a number system for the sections of the reservoir shall <br />be designated on the drawing. <br />b) All tank and reservoir appurtenances shall be described in terms of coating condition and <br />extent of corrosion. Any mechanical or structural defects visually recognizable shall be identified. <br />c) The inspection video shall include pertinent portions of the cleaning as it is done to show <br />amounts and types of material found in the tank or reservoir. This video shall show before and <br />aftereffects of cleaning with close views to verify adequate brushing of surfaces. Color (4”x6”) <br />still photos at the bases of columns, to be chosen by the City shall be made. Documentation of <br />findings will be shown on the reservoir drawing. <br /> <br />E. Recommended Repairs <br />The report shall outline the recommended repairs based on the observations and inspections of the <br />diving team. Group the recommendations by the following priority system: <br />Priority 1: Structural integrity related. Failure to make this repair could result in a structural failure <br />of the tank, reservoir, or appurtenance. <br />Priority 2: Maintenance related repairs. This type of repair is required, but the necessity to <br />complete it is not urgent. <br />Priority 3: Maintenance suggestions. This type of recommendation is not required. <br /> <br />DISPOSAL OF SEDIMENTS <br />The Contractor shall be responsible for the legal disposal of all tank and reservoir sediment. The <br />Contractor shall inform the City in writing that all sediment has been legally disposed of. <br />EXHIBIT A <br />DocuSign Envelope ID: 127FE52A-CAEF-4879-B943-68F42EA8FF9D