Laserfiche WebLink
City of Pleasanton “As Needed Services – Facilities” <br /> RFP#PWD-24-403 <br /> <br /> <br />EXHIBIT A FY 2024/25 – RATE SHEET <br /> <br />FACILITIES MAINTENANCE & RENOVATIONS <br />“ROLL-UP & SECTIONAL DOORS & GATE REPAIRS” <br />SCOPE OF SERVICES <br />The City of Pleasanton is seeking proposals from qualified contractors to provide comprehensive <br />services for the repair, servicing, and replacement of Roll-Up, Sectional Doors, and Gates on City <br />buildings and structures. This procurement aims to ensure the proper functioning, safety, and security of <br />these essential components across our facilities. <br /> <br />Service Description: The selected contractor will be responsible for a range of services related to Roll- <br />Up, Sectional Doors, and Gates, including but not limited to construction, repair, servicing, and <br />replacement. These services must be provided as required to maintain the functionality and integrity of <br />City buildings and structures. <br /> <br />Scheduled Maintenance and Emergency Repairs: The contractor will perform scheduled maintenance <br />tasks and emergency repairs on Roll-Up, Sectional Doors, and Gates as needed. Services will be <br />provided on both a scheduled basis and during emergencies, with availability for 24-hour response, <br />including overtime if required, to address any urgent issues promptly. <br /> <br />Construction and Replacement: Contractors must be capable of constructing new Roll-Up, Sectional <br />Doors, and Gates as well as replacing existing ones. This includes the installation of necessary hardware, <br />mechanisms, and safety features to ensure optimal performance and longevity. <br /> <br />Personnel, Materials, and Equipment: Qualified personnel equipped with the necessary materials, <br />tools, and equipment will be furnished by the contractor to perform the required services. All materials <br />used must meet industry standards and safety regulations. <br /> <br />Compliance and Safety: Strict adherence to building codes, regulations, and safety protocols is <br />imperative to ensure the safety and functionality of Roll-Up, Sectional Doors, and Gates within City <br />buildings and structures. <br /> <br />Communication and Collaboration: Effective communication and collaboration between the <br />contractor and the City's project manager are essential for successful project execution. Regular updates, <br />coordination meetings, and clear communication channels will facilitate project progress and address <br />any issues or concerns promptly. <br />RATE SHEET <br />The cost quoted below shall include all taxes and all other charges, including travel expenses, and is the <br />cost the City will pay for the term of any contract that is a result of this bid. <br /> <br />Bidder hereby certifies to City that all representations, certifications, and statements made by Bidder, as <br />set forth in this Bid Form and attachments are true and correct and are made under penalty of perjury <br />pursuant to the laws of California. <br />DocuSign Envelope ID: 1EE34764-55F5-4755-A4D3-E405DE99161E