My WebLink
|
Help
|
About
|
Sign Out
SANTA CRUZ MOUNTAINS TRAIL STEWARDS
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
S
>
SANTA CRUZ MOUNTAINS TRAIL STEWARDS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2024 3:40:29 PM
Creation date
6/28/2024 9:08:35 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
As-Needed Agreement for Maintenance or Trade
Contract Type
New
NAME
SANTA CRUZ MOUNTAINS TRAIL STEWARDS
Contract Record Series
704-05
Munis Contract #
2025041
Contract Expiration
6/30/2027
NOTES
FOR PARK, TRAIL, AND MEDIAN MAINTENANCE.RENOVATION REPAIRS RFP #PWD 24-301
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
●Trail counter installation and management <br />●Environmental site conditions research and how these constraints impact trail design/construction,includingenvironmental/permitting requirements <br />●Watershed and stream crossing analysis,and post fire erosion and runo susceptibility mapping <br />Trail,Road,and General Construction Services <br />●Trail construction,including mechanized construction and conservation crew supervision <br />●Trail and road reconstruction and maintenance (including drainage improvement,logout &brushing) <br />●Culvert,piping/inlet,stormwater retention chamber installation <br />●Underground utility improvements <br />●Rock armoring and trail/road surfacing <br />●Construction of rock and wooden retaining walls <br />●Erosion control,drainage improvement,and revegetation <br />●Trail bridge construction including concrete abutment formwork,reinforcing and pour,stringer placement <br />and carpentry <br />●Hazard mitigation including tree removal and fire suppression repair <br />Bike Park and Pump Track Construction and Maintenance <br />●Pump track,jump and skills course design,project management,and construction <br />●Pump track paving and soil stabilizer application <br />●Storm drain piping and inlet installation and stormwater retention chamber installation <br />●Landscaping including finish grading,irrigation,split rail fencing,and native plant and sod installation <br />Volunteer Training and Supervision <br />●Volunteer recruitment,signups,coordination,communication,training,work planning,supervision and <br />hospitality for events ranging from 5-100+volunteers <br />Education and Training <br />●Focused training available for field sta ,volunteers,conservation corps and land managers <br />●Training available in trail design,construction,maintenance,or volunteer management <br />●Developed Trail Academy volunteer training program with online,classroom,and field training coursesdesignedtoeducateandempowerourvolunteerworkforcehttps://act.santacruztrails.org/trail-academy.Over 500 unique volunteers have joined our training classes since 2013 <br />Recent Additional Projects Completed <br />Flood Park Pump Track <br />Location:Menlo Park,CA <br />Size:14,000 square feet <br />Owner:County of San Mateo <br />Budget:$500,000 <br />Completed:October 2023 <br />Contact:Nicholas Calderon <br />DocuSign Envelope ID: 58391F88-9A81-4109-96D6-C25AFCC4681A
The URL can be used to link to this page
Your browser does not support the video tag.