Laserfiche WebLink
and lack of sustainable design,the trails were eroded,especially in steeper areas,and it was becoming dicult to <br />keep up with the maintenance.SCMTS used their GIS skills to create scouting maps and evaluate the trails at JoaquinMillerPark.They spent a day hiking and biking the trails to perform an assessment and identify issues with the trails <br />and the characteristics of the design or construction that contributed to those issues.All of this data was compiled <br />into an assessment report that included identification of the trail issues,recommendations for corrective actions,and <br />the estimated costs of the corrections. <br />Hollow Tree Trail Fuel Reduction <br />Agencies:CA State Parks <br />Contact:Tim Hyland (831)345-3331 <br />Value:$317,000 <br />Dates:June 2023 to October 2023 <br />Description:Santa Cruz Mountains Trail Stewardship was hired to clear a control line along the 2.5-mile Hollow Tree <br />Trail in Big Basin Redwoods State Park.The control line is for a 1000-acre controlled burn planned for Fall 2023.All <br />dead trees within 20 feet of the trail were felled,bucked,and limbed and formed into burned piles.All brush (mainly <br />Ceanothus)within 50 feet of the trail was trimmed below knee height,and cuttings were dispersed within the burn <br />zone. <br />Cotoni-Coast Dairies Trail Construction <br />Agency:Bureau of Land Management <br />Contact:Adam Wilde (831)582-2222 awilde@blm.gov <br />Value:$1,500,000 <br />Length:5 miles <br />Volunteer hours:3000 <br />Dates:October 2021 to Present <br />Skills:Trail system planning,trail design,corridor clearing,machine trail construction,hand trail construction,hand <br />trail finishing,rock wall construction,switchback construction,bridge design,bridge construction,puncheon <br />construction,trail armoring,volunteer management <br />Description:SCMTS is partnering with the Bureau of Land Management (BLM)to provide public access to the recently <br />designated Cotoni-Coast Dairies National Monument in Davenport,CA.They worked with the recreation planners at <br />the BLM to develop a trail system that is multi-user and provides a variety of recreation opportunities.At final build <br />out,the trail system will include 19 miles of trail,including a 2.5-mile loop designed specifically for access by <br />adaptive mountain bikes.The trail system will eventually link the coastal trail with the San Vicente Redwoods Trail <br />System.Currently,SCMTS has completed construction on two loops totalling 5 miles of trail.The first loop,known as <br />Aqua Puerca is a 48-inch multi-user trail that includes two bridges and several armored sections.The second loop, <br />known as Molino Creek,is a narrow 24-inch trail with a number of stone retaining walls and a 200-foot,pitched stone <br />causeway. <br />Cotoni -Coast Dairies Trail Design,California Coastal National Monument,Davenport,CA <br />Agencies:Bureau of Land Management <br />Contact:Adam Wilde (559)676-9809 awilde@blm.gov <br />Value:$1.5 million <br />DocuSign Envelope ID: 58391F88-9A81-4109-96D6-C25AFCC4681A