My WebLink
|
Help
|
About
|
Sign Out
DPI, INC. (2)
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
D
>
DPI, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2024 4:12:10 PM
Creation date
6/25/2024 4:11:35 PM
Metadata
Fields
Template:
CONTRACTS
Description Type
As-Needed Agreement for Maintenance or Trade
Contract Type
New
NAME
DPI,NC.
Contract Record Series
704-05
Munis Contract #
2025004
Contract Expiration
6/27/2027
NOTES
FOR UTILITIES - WATER, SEWER, & STORM MAINTANENCE & EMERGENCY REPAIRS RFP #PWD 24-601
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 5 <br />Amount (1) <br />FACILITIES RENOVATION: <br />Building Painting Services D&D Commercial & Residential <br />Paint <br />$200,000 <br />General Contractor Services Donny Chu Construction, Inc <br />Jennison Construction <br />Wilson General Contracting Inc. <br />$200,000 <br />$200,000 <br />$200,000 <br />Electrical Service Repairs Donny Chu Construction, Inc <br />Harvey Electric <br />Wilson General Contracting Inc. <br />$200,000 <br />$200,000 <br />$200,000 <br />Locksmith Services No Proposals <br />Plumbing Services/Repairs ACCO Engineered Systems <br />Donny Chu Construction, Inc <br />Wilson General Contracting Inc. <br />$50,000 <br />$50,000 <br />$50,000 <br />Roll-Up Doors/Gate Repairs Nor-Cal Overhead, Inc. <br />Wilson General Contracting Inc. <br />$75,000 <br />$75,000 <br />Roofing Repairs/Replacement Roofline Builders Inc. $150,000 <br />Window/Door Glass Repairs Donny Chu Construction, Inc. <br />Team Glass, Inc. <br />$75,000 <br />$75,000 <br />UTILITIES (WATER, SEWER, AND STORM) REPAIRS: <br />Generator Repair Services Got Power Inc dba CD & Power $300,000 <br />Electrical Services Calcon Systems, Inc <br />SD Electric <br />$200,000 <br />$200,000 <br />Polybutylene Service <br />Replacement <br />DPI, Inc <br />West Valley Construction Co. Inc. <br />$200,000 <br />$200,000 <br />Process Control ATEEM Electrical Engineering Inc. <br />Telstar Instruments <br />Tesco Controls, LLC <br />$150,000 <br />$150,000 <br />$150,000 <br />Pump Repairs Pump Repair Service Co, Inc $250,000 <br />Reservoir Cathodic Protection & <br />Inspection <br />No Proposals <br />Reservoir Cleaning & Inspection Coating Specialists and <br />Inspection, Inc <br />$75,000 <br />Underground Infrastructure <br />Repairs <br />Cazadoro Construction Inc <br />DPI, Inc <br />West Valley Construction Co. Inc <br />$300,000 <br />$300,000 <br />$300,000 <br />STREETS REPAIRS: <br />DocuSign Envelope ID: FF8F9FAD-36C7-4439-8838-8E1313EFB51E
The URL can be used to link to this page
Your browser does not support the video tag.