Laserfiche WebLink
Resolution No. 2024-049 <br />Page 2 of 3 <br />WHEREAS, the SB -1 project list and overall investment in our local streets and roads <br />infrastructure with a focus on basic maintenance and safety, investing in complete streets <br />infrastructure, and using cutting-edge technology, materials and practices, will have significant <br />positive co -benefits statewide. <br />NOW, THEREFORE BE IT RESOLVED THAT THE CITY COUNCIL OF THE CITY OF <br />PLEASANTON DOES RESOLVE, DECLARE, DETERMINE AND ORDER THE FOLLOWING: <br />SECTION 1. The foregoing recitals are true and correct. <br />SECTION 2. Amends the Streets CIP for fiscal year 24/25, incorporating the following <br />planned project to be funded with Road Maintenance and Rehabilitation Account revenues: <br />Annual Resurfacing and Reconstruction of Various Streets, CIP No. 25503. <br />The project will resurface 533,000 square feet of various streets throughout the City during <br />summer 2025 at the following locations: <br />STREET NAME <br />BEGIN LOCATION <br />END LOCATION <br />HANSEN DR <br />CALLE REYNOSO <br />VALLEY AVE <br />PASEO SANTA CRUZ <br />HANSEN DR <br />CORTE SANTA MARIA <br />PASEO SANTA CRUZ <br />CORTE SANTA MARIA <br />VIA DE LOS CERROS <br />IA DE LOS CERROS <br />PASEO SANTA CRUZ <br />VALLEY AVE <br />CALLE DE LA LOMA <br />PASEO SANTA MARIA <br />VIA DE LOS CERROS <br />CAMINO SEGURA <br />VIA DE LOS CERROS <br />PASEO SANTA CRUZ <br />CAMINO DEL CINO <br />CAMINO DEL LAGO <br />(WEST) <br />CAMINO DEL LAGO (EAST) <br />CORTE DEL CINO <br />CAMINO DEL LAGO <br />END <br />CORTE MERCADO <br />PASEO SANTA CRUZ <br />END <br />CAMINO DEL LAGO <br />PASEO SANTA CRUZ <br />CAMINO SEGURA <br />CORTE DEL VISTA <br />PASEO SANTA CRUZ <br />END <br />CALLE ALTAMIRA <br />S/O CORTE MONTEREY <br />PASEO SANTA CRUZ <br />CALLE ALTAMIRA <br />CALLE REYNOSO <br />S/O CORTE MONTEREY <br />CORTE MATEO <br />CALLE ALTAMIRA <br />END <br />CORTE ANTONIO <br />PASEO SANTA CRUZ <br />END <br />BLACK AVE <br />38 FT. E/O CALLE <br />RICARDO <br />106 FT. W/O CAMINO BRAZOS <br />(WEST) <br />W. LAS POSITAS BLVD <br />FOOTHILL RD <br />MUIRWOOD DR <br />W. LAS POSITAS BLVD <br />MUIRWOOD DR <br />I-680 <br />The project will be started in spring 2025 and completed by winter 2025. The resurfacing <br />treatments will extend the useful life of the treated roadway by an additional 10 to 15 years. <br />