My WebLink
|
Help
|
About
|
Sign Out
TETRA TECH INC.
City of Pleasanton
>
CITY CLERK
>
CONTRACTS
>
T
>
TETRA TECH INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2024 3:46:32 PM
Creation date
6/18/2024 10:12:46 AM
Metadata
Fields
Template:
CONTRACTS
Description Type
Professional Services
Contract Type
New
NAME
TETRA TECH INC.
Contract Record Series
704-05
Munis Contract #
2024622
Contract Expiration
12/31/2025
NOTES
DEVELOPING AN UPDATE TO THE CITY;S EMERGENCY PLAN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. For all sums which the insured becomes legally <br />obligated to pay as damages caused by <br />"occurrences" under Section I ---- Coverage A, and <br />for all medical expenses caused by accidents <br />under Section I ---- Coverage C, which cannot be <br />attributed only to ongoing operations at a single <br />designated construction project shown in the <br />Schedule above: <br /> 1. Any payments made under Coverage A for <br />damages or under Coverage C for medical <br />expenses shall reduce the amount available <br />under the General Aggregate Limit or the <br />Products-completed Operations Aggregate <br />Limit, whichever is applicable; and <br /> 2. Such payments shall not reduce any <br />Designated Construction Project General <br />Aggregate Limit. <br />C. When coverage for liability arising out of the <br />"products-completed operations hazard" is <br />provided, any payments for damages because of <br />"bodily injury" or "property damage" included in <br />the "products-completed operations hazard" will <br />reduce the Products-completed Operations <br />Aggregate Limit, and not reduce the General <br />Aggregate Limit nor the Designated Construction <br />Project General Aggregate Limit. <br />D. If the applicable designated construction project <br />has been abandoned, delayed, or abandoned <br />and then restarted, or if the authorized <br />contracting parties deviate from plans, blueprints, <br />designs, specifications or timetables, the project <br />will still be deemed to be the same construction <br />project. <br />E. The provisions of Section III ---- Limits Of <br />Insurance not otherwise modified by this <br />endorsement shall continue to apply as <br />stipulated. <br />DocuSign Envelope ID: 617B9B2E-5FA3-4D49-A8B0-1A794D1CD9A7
The URL can be used to link to this page
Your browser does not support the video tag.